|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2018-02-05-CONCOM-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Conservation Commission-ConCom
>
Minutes
>
2010-2019
>
2018
>
2018-02-05-CONCOM-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2019 1:14:22 PM
Creation date
4/4/2018 1:03:45 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - CONCOM - Conservation Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Hartnett stated that they have met with the Town's peer reviewer to discuss the stormwater <br /> aspect of the project. He addressed some of the issues raised in the peer reviewer. Mr. Hartnett <br /> stated the peer reviewer has requested more information TSS removal rates. They have <br /> coordinated with the Army Corps of Engineers to review the project. <br /> They have recalculated the shadow study in the fall and spring, but concluded that the time with <br /> the most shadow in the wetlands is in the summertime. There will only be 500 sq. ft. of <br /> disturbance during part of the day because of the shadow. <br /> More details regarding the pedestrian bridge were given. <br /> Questions and comments from the commission: <br /> The commission stated that they do want more information regarding the TSS removal. <br /> The commission stated that they want to see additional test pit resuilts. <br /> The commission stated that they want to see the edited language for the CR. <br /> The commission stated that they want the trail head parking spaces to be paved, not stone dust. <br /> The commission stated that they want the vernal pool labeled with buffer zones shown on plan. <br /> Motion to continue the hearing, at the applicant's request, made by Mr. Beuttell and seconded by <br /> Mr. Wolk. Vote: 5-0 in favor. <br /> New Hearings <br /> 7:50pm <br /> DET 18-1 <br /> RDA, 52 Percy Road <br /> Owner/Applicant: Cells Brisbin and Carolyn Silva-Brisbin <br /> Project: Septic abandonment and sewer connection <br /> Jack Sullivan- Sullivan Engineering Group, Celis Brisbin and Carolyn Silva-Brisbin- Home <br /> owners <br /> Documents: RDA package, Sewer Service Connection plan 1/3/2018, Engineering report <br /> 1/30/2018 <br /> Mr. Sullivan explained that this property has an old house on it which the owners are proposing <br /> to renovate from the interior. In the rear of the house is an old cess pool which they are <br /> proposing to decommission. Following the decommissioning, they are going to install a grinder <br /> and force main to pump the sewer to the town system. Erosion controls are proposed and any <br /> disturbance will be temporary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.