|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2014-01-27 BOS Packet - Released
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Select Board-SB (formerly Selectmen, Board of-BOS)
>
Agenda Packets
>
2014
>
2014-01-27 BOS Packet - Released
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2018 12:26:10 PM
Creation date
4/3/2018 12:26:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM SUMMARY <br />LEXINGTON BOARD OF SELECTMEN MEETING <br />DATE:STAFF:ITEM NUMBER: <br />January 27, 2014 William P. Hadley, Director I.1c <br />SUBJECT: <br />Traffic Safety Advisory Committee Recommendation – <br />New Crosswalk Prospect Hill Road near Wachusett Drive <br />EXECUTIVE SUMMARY: <br />New Crosswalk - Concerns of the Bridge School Community and the residents of Prospect Hill <br />Road area over pedestrian safety. A significant number of school children walk down Wachusett <br />Drive and cross Prospect Hill Road to access the sidewalk on the westerly side of Prospect Hill <br />Road. Currently there is no crosswalk near this area. Engineering inspected the area and feel <br />that installation of a crosswalk at this location will let the pedestrians know where the best <br />crossing location is and provide more than adequate sight distance to motor vehicles. <br />Site inspection by Police and Engineering staff support installation of a new crosswalk at this <br />location. Traffic safety staff members comprised of the Police, Engineering, School <br />Administration and Transportation Services reviewed and support establishing and maintaining <br />this regulatory sign. <br />FINANCIAL IMPACT: <br />Cost of materials and installation of the ADA Compliant pedestrian ramps, warning signing and <br />pavement marking is estimated at $2500 <br />RECOMMENDATION / SUGGESTED MO <br />TION: <br />Motion to approve the installation of a new crosswalk on Prospect Hill Road as shown <br />STAFF FOLLOW-UP: <br />If approved, the DPW Highway Dept will install and maintain this Crosswalk as shown. <br />G:\\AGENDAS\\012714 TSAC-Crosswalk on Prospect Hill (1).doc <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.