|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2014-01-27 BOS Packet - Released
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Select Board-SB (formerly Selectmen, Board of-BOS)
>
Agenda Packets
>
2014
>
2014-01-27 BOS Packet - Released
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2018 12:26:10 PM
Creation date
4/3/2018 12:26:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM SUMMARY <br />LEXINGTON BOARD OF SELECTMEN MEETING <br />DATE:STAFF:ITEM NUMBER: <br />January 27, 2014 William P. Hadley, Director I.1a <br />SUBJECT: <br />Traffic Safety Advisory Committee Recommendation – <br />Reconstruction of Diamond School Traffic island into a Modern Roundabout <br />EXECUTIVE SUMMARY: <br />The traffic circle near the Diamond Middle school has been redesigned to make it conform to a <br />Modern Roundabout Design. Currently this circle encourages pedestrians to access the center of <br />the circle causing significant vehicular/pedestrian conflicts. The current design has some <br />approaches operating as high speed bypasses and some approaches operation under stop control. <br />There is poor sight distance at all approaches. <br />The new design includes the following improvements: <br />Realignment of all approaches to provide proper sight distance <br />All approaches will be yield conditions <br />Provides approach deflection to reduce all speeds to 20 MPH <br />Relocate pedestrian traffic from the center of the circle to the perimeter reducing <br />vehicular/pedestrian conflicts. <br />Site inspection by Police and Engineering staff support this project. Traffic safety staff members <br />comprised of the Police, Engineering, School Administration and Transportation Services <br />reviewed and support establishing and maintaining this roundabout <br />FINANCIAL IMPACT: <br />The total cost of this project is estimated at $90,000; however this area is due for pavement <br />maintenance which would be estimated at $50,000; the incremental cost to do this work in <br />conjunction with the annual pavement management program is approximately $40,000 <br />RECOMMENDATION / SUGGESTED MOTION: <br />Reconstruction of Diamond School Traffic island into a Modern Roundabout as shown. The <br />regulatory changes at this location would be converting three stop sign to yield signs, at the <br />North Hancock, Hamilton and Diamond School approaches. <br />STAFF FOLLOW-UP: <br />If approved, the DPW Highway Dept will install and maintain this Roundabout. <br />G:\\AGENDAS\\012714 TSAC-Diamond.doc <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.