Laserfiche WebLink
Interim Recommendation to BOS 9/23/13—from Ad Hoc Community Center Advisory Committee <br /> Recommendation#1 <br /> Guiding principles for interim construction: <br /> • Initial physical modifications to the building should be minimally invasive <br /> • An effort should be made to minimize the costs associated with the interim construction and to avoid <br /> doing work that may have to be modified or changed for the permanent occupancy plan. <br /> Nonetheless, energy improvements or other modifications that have the potential to reduce the <br /> Town's building maintenance costs could be considered at this early interim stage because of the <br /> resulting operational savings the Town might achieve. <br /> • Startup renovations should focus on building code compliance and telecommunication needs to <br /> operate and function as a public municipal building <br /> • There should be no removal of load bearing walls, structural changes to the building, nor any <br /> signification exterior work, except for that required for ADA accessibility or other permitting and code <br /> compliance reasons <br /> • Renovations to the new Center should generally follow the SBA schematic construction plan identified <br /> as "Interim Scope, Sept. 16, 2013" and further improved in its 09/23/13 drawings presented <br /> concurrently with this document. <br /> • Interim locations of offices and programming spaces should not be finalized until the construction <br /> plans are further fleshed out and more information is gathered. Thus, plans and drawings at this early <br /> stage should be considered illustrative, for conceptual use only. <br /> • Absent detailed construction drawings, the cost estimate for the construction improvements are still a <br /> work in progress. The Board of Selectmen, with the advice of staff and architectural consultants, <br /> should determine the final appropriate budget to present to Town Meeting as more information <br /> becomes available. <br /> • All Muzzey Senior Center functions should be moved to the new facility at this interim stage. <br /> • Interim construction should be guided by the need to maintain critical and core senior services, and <br /> meet code compliance (including adding bathrooms and other plumbing fixtures if needed to meet <br /> new occupancy demands). <br /> Recommendation#2: <br /> Human Services: The majority of Lexington's Human Service functions are located at Muzzey <br /> Condominium on 1475 Mass. Avenue. Muzzey Condominium's deficiencies have been well documented <br /> in separate studies and include life safety code deficiencies and non-compliance with ADA accessibility. <br /> The first phase of a two year renovation totaling$1,040,444 was approved under Article 8C Annual Town <br /> Meeting 2012.The$561,518 appropriation has not been spent, and second phase funding was not sought <br /> at Annual Town Meeting 2013, as the Human Services Department are intended to move into the <br /> Community Center. All Muzzey services need to be moved to the new center as soon as possible in order <br /> to avoid having to make the above mentioned expensive life-safety code and ADA compliance upgrades <br /> ------------------------------------------------------------------------------------------------------------------------------------------------------- <br /> Distributed to BOS for its Meeting of 09123113 Page 1 of 2 <br />