Laserfiche WebLink
AGENDA ITEM SUMMARY <br /> LEXINGTON BOARD OF SELECTMEN MEETING <br /> DATE: PRESENTER: ITEM NUMBER: <br /> September 23, 2013 Michelle Ciccolo, Chair, CCAC L5 <br /> Pat Goddard <br /> SUBJECT: <br /> Ah Community Center Advisory Committee (AhCCAC) Recommendations <br /> EXECUTIVE SUMMARY: <br /> At the 2013 Annual Town Meeting, funding was authorized to hire an architectural firm to prepare <br /> schematic design and design development documents for the fit-up and code compliance of the new <br /> Community Center (CC), to allow initial occupancy of the Marrett Road facility. At this stage, <br /> plans have been developed to a point that allows the Board to consider advancing the plan to <br /> Town Meeting, seeking an appropriation for the architect to prepare construction drawings and for <br /> funding to enable that construction to proceed. The AhCCAC has been meeting with the architects, <br /> town staff, and other stakeholders to help make recommendations on an interim occupancy plan <br /> (part of its charge) and to evaluate and make recommendations on the permanent facility(also in <br /> its charge). <br /> The plans before the Board tonight represent only the minor code, HVAC, telecommunications, and <br /> ADA modifications required for initial occupancy. Minor wall reconfiguration to non-load bearing <br /> walls are also included to enable the availability of larger spaces for classrooms and activities, <br /> necessary if any public functions will be conducted at Marrett Road. The building cannot be <br /> occupied without the majority of the modifications shown on the plans. Steffian Bradley <br /> Architects (SBA) has been able to demonstrate that the existing building, with these recommended <br /> changes, can accommodate and fit all of the Human Services offices and Recreation offices, along <br /> with the major functions presently conducted at Muzzey and still provide swing spaces that can be <br /> shared for multiple purposes for Community Center programming. <br /> Who and what goes where is still to be finalized as the plans advance and more information is <br /> gathered. A schedule is provided in the SBA portion of the report which shows that if the Interim <br /> Construction proj ect receives approval at Town Meeting, construction would occur this winter and <br /> early spring and the facility should be ready for occupancy around June 2014. Concurrent with <br /> the ongoing development of the Interim construction and occupancy plan, the AhCCAC, Staff, and <br /> Prepared by MC <br />