Laserfiche WebLink
� Tech, I mac_ <br /> Professional Installation and Management Provider <br /> Selectmen's Office <br /> Town Office Building <br /> 1625 Massachusetts Avenue <br /> Lexington, MA 02420 <br /> May 20,2013 <br /> Regarding:Pending Utility Construction <br /> Dear Board of Selectmen, <br /> MSO-Tech, Inc., is preparing to install an underground conduit along the Concord <br /> Turnpike/State Route 2, Spring Street, Marrett Road, Massachusetts Avenue,Wood Street, <br /> and Hartwell Avenue as detailed on the project drawings for a new communications lateral <br /> to provide service to Hanscom Air Force base. The field survey, the review of available <br /> utility records, and the drafting have been completed and the drawings are believed to be <br /> representative of the actual field conditions and the required scope of work. The work will <br /> include the installation of HDPE duct and access handholes generally installed by open <br /> trench methods to facilitate the placement of a fiber optic Gable. Please review the drawings <br /> and approve this project so we may be allowed to proceed with construction. <br /> Please return via fax to(682) 503-5005 -Attention. Michael Fox <br /> Thank you for your cooperation. <br /> William Wilson <br /> President <br /> MSO-Tech,Inc. <br /> 10 South Lake Avenue • Lake Sutler, Florida 32054 # 877-269-1153 # Fax 386-496-3933 <br />