Laserfiche WebLink
Page 2 Minutes for the Meeting of January 17, 2018 <br />Board Comments: <br /> <br /> What properties are controlled by the applicant? Mr. Farrington said all properties are <br />owned except the land that is to be ANR from 185 Lincoln Street. <br /> <br /> Have you considered a special permit like SSD or BHD? Mr. Farrington said it was a <br />difficult site but not everything is off the table. Have you identified any waivers that you <br />would want to ask for the definitive plan? Mr. DeCelle said not yet. <br /> <br /> Do you believe the ANR meets the standards in our bylaws? Mr. Farrington replied yes it <br />complies with case law. <br /> <br /> What is the action deadline? January 27. Would you allow an extension of the action <br />deadline? Yes. <br /> <br /> There will be topographical changes with soils being brought in and removed do you <br />have the numbers yet? No <br /> <br /> There are about 18 acres of open space above the properties on Lincoln Street. Can you <br />find a way to allow wildlife to continue to pass through the protected area and roam that <br />space as they do now? Yes the applicant will look into it. <br /> <br /> Would like to walk the site and set a date? Staff will send out a poll to select a good date <br />for everyone. <br /> <br /> Has the history of the parcel with the ANR at 185 Lincoln Street been reviewed by staff? <br />The applicant and staff will discuss further at a later date. <br />Audience Comments: <br /> <br /> We just heard about this project two days ago there will be a significant reduction of open <br />space and impact the wildlife. Request that at least 15% of the site keep the remaining <br />trees and not destroy the forest. <br /> <br /> Concerns about the damage to the roads during construction of the five streets four are <br />private ways and only one is accepted. <br />A Board Member asked the applicant if he had reached out to any neighbors. Mr. Farrington said <br />they only met with the immediate neighbors so far. The Board assumes there will be more <br />outreach. The Engineering Department has submitted their concerns. The applicant just got them <br />and will address them. <br /> <br /> Many years ago the water pressure in my house was measured very low how will the <br />additional houses impact the water pressure? Mr. Henry said Engineering is aware and <br />there will be ongoing discussions with DPW and the applicant and if this is to go forward <br />the water pressure will first have to be addressed. <br /> <br />