Laserfiche WebLink
Mary Trudeau- wetlands scientist, Debbie Fortin-homeowner <br /> Ms. Trudeau explained that a couple of months ago, they came in front of the commission for a <br /> determination. At that point, the wetlands were found to be closer the property than originally <br /> thought so they are now filing the Notice of Intent. The proposed work includes an addition to <br /> the garage and house as well as an expansion of the driveway. An infiltration system has been <br /> designed to mitigate for the two additions and the additional driveway area. <br /> Mr. Hamilton entered the engineering report into the record. <br /> Motion to close the hearing made by Mr. Wolk and seconded by Mr. Beuttell. Vote: 6-0 in favor. <br /> 9:30pm <br /> DEP File 201-XXXX, BL XXXX <br /> NOI, 55 Cary Ave <br /> Owner/applicant: Stephen Strafford <br /> Project: Raze and rebuild SFD <br /> Rich Kirby- LEC Environmental, Terry Stevens-representative of homeowner <br /> Mr. Kirby explained that this project is a raze and rebuild of a single family home. The existing <br /> house extends within to the 50 ft. buffer. The lawn area extends into the wetland area. Portions of <br /> the proposed house will extend into the 50 ft. buffer, but is significantly further from the <br /> wetlands than the existing house. A large portion of the lawn will be restored to wetland <br /> vegetation. <br /> Mr. Hamilton entered the engineering report into the record. <br /> Questions and comments from the commission: <br /> The commission stated that they are concerned about approving the wetlands line because they <br /> have not seen it without snow cover. The commission stated that they need to do a site visit <br /> without snow before they can approve this project. <br /> The commission stated that they are concerned that the infiltration system behind the retaining <br /> wall will leak through the wall. Mr. Kirby stated that he will talk to the project engineer <br /> regarding this issue and look at installing a polyliner. <br /> The commission stated that they want to see FENO markers on the plan. The commission <br /> discussed where they would like to see the FENO markers placed. <br /> The commission discussed their performance standards and whether they can allow this project <br /> because it is within the 50 ft. buffer. Although the existing garage and house extend into the 50 <br /> ft., buffer, the commission stated they are comfortable with the project. <br />