Laserfiche WebLink
Ms. Neely explained that they have removed a trampoline and zip line from the wetland area. <br /> The sheds are the remaining concern. They are proposing to add peastone along the edges of the <br /> shed to mitigate for the run off. <br /> Motion to approve mitigation and insignificant plan change made by Mr. Beuttell and seconded <br /> by Ms. Dohan. Vote: 6-0 in favor. <br /> 8:05pm <br /> DEP 201-1079, BL 1036 (Continued Hearing) <br /> NOI, 7 Crosby Dive, Hastings School <br /> Owner/applicant: Town of Lexington <br /> Project: New school building and associated site work <br /> Fred King- Schofield Brothers, Vivian Lowe- DiNisco Design, Bill Brown- Landscape architect <br /> Mr. King explained that since the last meeting, they have revised the plans to reflect the changes <br /> that the commission requested. The changes included clarification regarding washed stone detail, <br /> clarification on subdrain details, level spreader details, the inclusion of biodegradable erosion <br /> control blankets, details on manholes, and boulder wall details. Mr. Brown explained that <br /> additional native plantings were added along the slope including trees and shrubs. Mr. King <br /> stated that they will add shrubs to the biobasins. <br /> Questions and comments from the commission: <br /> The commission stated that they are uncomfortable with use of cultivar plants. Mr. Brown <br /> explained that in some areas on the site, they must use cultivars because of varying reasons such <br /> as sightlines and safety. <br /> The commission stated that the applicant should have the specific batch of pervious pavement <br /> tested that day so that they can determine early on if there will be a failure. <br /> Motion to close the hearing made by Mr. Beuttell and seconded by Mr. Wolk. Vote: 6-0 in favor. <br /> 8:43pm <br /> DEP 201-XXXX, BL XXXX <br /> NOI, 45, 65, and 75 Hayden Ave <br /> Owner/applicant: King Street properties <br /> Project: New office building, garage, and associated site work <br /> Doug Hartnett and Jesse Agular- High Point Engineering, John Rockwood- wetlands scientist, <br /> Rob Albrook- King Street Properties. <br /> Mr. Hartnett explained that the property in question went through a rezoning process in the fall. <br /> As part of the process they signed a memorandum of understanding with the town and submitted <br />