Laserfiche WebLink
The certificates of compliance will be reviewed at the next meeting. <br /> 6:54pm <br /> Approve minutes from 10/2/2017 <br /> Motion to approve minutes made by Mrs. Dohan and seconded by Mr. Beuttell. Vote: 7-0 in <br /> favor. <br /> 6:55pm <br /> Schedule Site Visits for the 11/13/17 meeting <br /> Site visits were scheduled for 11/11/17 at 9am. <br /> 6:56pm <br /> Reports <br /> Mrs. Dohan reported that on 11/2/17 the Wright Farm Focus Group will be meeting. <br /> 6:57pm <br /> DET 17-29 <br /> RDA, 19 Bellflower Street <br /> Owner/applicant: Justine Neely <br /> Project: Repair and replace existing retaining wall <br /> Justine and John Neely- homeowners <br /> Mrs. Neely explained that they bought their home from a builder after an addition was put on a <br /> few years ago. However, the retaining wall in the back yard was not built properly and they <br /> would like to rebuild the wall to the specs of the original plan that the commission approved. <br /> Questions and comments from the commission: <br /> The commission asked if a Certificate of Compliance was issued for this project. Ms. Mullins <br /> said that she would look into this. <br /> The commission stated that they want to condition erosion controls. <br /> Motion to issue a Negative Determination with conditions made by Mr. Wolk and seconded by <br /> Mr. Beuttell. Vote: 7-0 in favor. <br /> 7:08pm <br /> DEP 201-1076, BL 1033 <br /> NOI, 4 Peachtree Road <br /> Owner/applicant: Naplex Construction LLC <br />