Laserfiche WebLink
Campanelli, Inc. (hearing continued) -3 <br />4/11/73 <br />' other building restriction over lot 10 could then be required as a condition <br />of a permit on lot 9." <br />A motion to grant the petition was made by Mr. Cataldo and seconded by <br />Mr. Sheldon. Mr. Clarke made a motion to amend the motion to grant the peti- <br />tion subject to all conditions specified by town boards. After discussion <br />the Board voted unanimously to grant the petition with the amendment. <br />Therefore, the finding and determination was granted to Campanelli, Inc. <br />under section 13 of the Lexington zoning by-law to construct a facility for <br />Tyco Laboratories, Inc. at 4 Hartwell Place according to four drawings sub- <br />mitted, these being a Definitive Plan and a Plan entitled Tyco Laboratory, <br />these two by Bradford Saivetz and Associates, dated 1/4/73 and revised twicee,,, <br />3/29/73, a Floor Plan of Tyco Instrument Division by Edgar H. Wood & Assocs.4, <br />Inc., dated 11/30/72 and a sketch of building and landscaping signed by "Rock" <br />- no date, subject to the following conditions: <br />1. The petitioner must abide by Engineering Wpartment rules as to drainage <br />and construction, overall layout, utilities, grading and materials. <br />2. The three waivers specified above by the Planning Board are approved. <br />3. Grease and oil catches must be placed within the storm sewer and no <br />salt or other chemicals may be used on the parking lot for ice control. <br />4. P�blic Health recommendations specified in the April 2 letter must be <br />followed regarding sanitary sewage disposal, public water supplies, flood <br />' control and air pollution. <br />5. The petitioner must be responsible for Conservation Commission approval. <br />6. Hours shall be 8 a.m. to 5 p.m. weekdays; 8 a.m. td 12 noon on Saturdays. <br />7. No excessive lighting may be used except as a safety measure. <br />8. Construction of the project must commence within one year from this date. <br />9. Approved methods of erosion control should be used in all disturbed areas. <br />The issuance of this finding and determination shall not in any manner affect <br />the requirement that a building permit be obtained. The petitioner shall have <br />the obligation to record a notice of this permit as required by statute. <br />The meeting adjourned at 8:55 p.m. <br />1 <br />Evelyn F. Cole <br />Clerk <br />