Lexington Home Page
|
Help
|
About
|
Browse
Search
2017-10-16-CEC-STM2-STM3-rpt
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
ELECTIONS AND TOWN MEETING ACTION & WARRANTS
>
Town Meeting Minutes and Reports
>
2010-2019
>
2017
>
Reports
>
2017-10-16-CEC-STM2-STM3-rpt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 4:22:16 PM
Creation date
10/12/2017 1:51:54 PM
Metadata
Fields
Template:
Archives
Year
2017
Author or Source
Capital Expenditures Committee
Department
Town Clerk
Keywords or Subject
Town Meeting CAPITAL EXPENDITURES COMMITTEE REPORT TO OCTOBER 16, 2017, STMs 2017-2 & -3
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAPITAL EXPENDITURES COMMITTEE REPORT TO OCTOBER 16,2017, STMs 2017-2&-3 <br /> 3900 ...,. <br /> 3700 ..... <br /> • 3 500 ..... <br /> owwM^mmmomu <br /> P«▪ 3300 o <br /> 00, <br /> w <br /> 3100 ���� MINN — — 1 <br /> ����U� --u���u Median p oje. <br /> z• 2900 ....,. ....,. .""'�" <br /> mom mom Lowp[1.0 ectinn <br /> Right-Sized capacIty. <br /> 2700 <br /> 2500 <br /> le <br /> rieQ> "Qi <br /> The elementary-school population projections are shown in the dashed lines. The total capacity is shown <br /> in the solid black, line. The increase in capacity in 2019-2020 requires that the new LCP be built. The <br /> increase in 2020-2021 requires that the new Maria Hastings be built at the currently envisioned 30- <br /> classroom size. Even with these measures, the school enrollments are expected to remain above capacity <br /> for the foreseeable future. <br /> Article 2:APPROPRIATE Fund <br /> FOR HASTINGS Authorization Funding Source Committee Recommends <br /> SCHOOL Requested <br /> CONSTRUCTION $63,059,418 GF (Debt) Approval (7-0) <br /> (Expected to be <br /> included in a <br /> subsequent Debt- <br /> Exclusion <br /> Referendum) <br /> "To see if the Town will vote to appropriate, borrow or transfer from available funds, a sum of <br /> money, to be expended under the direction of the Permanent Building Committee, for the costs to <br /> demolish the existing Maria Hastings Elementary School and construct, originally equip and furnish <br /> a new Maria Hastings Elementary School to be located at 7 Crosby Road, in Lexington, which school <br /> facility shall have an anticipated useful life as an educational facility for the instruction of school <br /> children of at least 50 years and for which the Town may be eligible for a school construction grant <br /> from the Massachusetts School Building Authority ("MSBA"). The MSBA's grant program is a non- <br /> entitlement, discretionary program based on need, as determined by the MSBA, and any costs the <br /> Town incurs in connection with the Construction phase in excess of any grant approved by and <br /> received from the MSBA shall be the sole responsibility of the Town. Any grant that the Town may <br /> receive from the MSBA for the Project shall not exceed the lesser of (1) 35.79 percent (%) of <br /> eligible, approved project costs, as determined by the MSBA, or (2) the total maximum grant amount <br /> determined by the MSBA; or act in any other manner in relation thereto." <br /> "DESCRIPTION: This funding will authorize additional funds to demolish the existing Hastings <br /> School and construct the new Hastings School, which will be partially reimbursed from the <br /> Massachusetts School Building Authority(MSBA)." <br /> 3 <br />