|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2017-10-16-AC-STM2-STM3-rpt
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
ELECTIONS AND TOWN MEETING ACTION & WARRANTS
>
Town Meeting Minutes and Reports
>
2010-2019
>
2017
>
Reports
>
2017-10-16-AC-STM2-STM3-rpt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 4:22:13 PM
Creation date
10/10/2017 2:44:50 PM
Metadata
Fields
Template:
Archives
Year
2017
Author or Source
Appropriation Committee
Department
Town Clerk
Keywords or Subject
Town Meeting APPROPRIATION COMMITTEE REPORT TO THE OCTOBER 2017 SPECIAL TOWN MEETINGS 2017-2 AND 2017-3
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPROPRIATION COMMITTEE SPECIAL TOWN MEETINGS 2017-2&3 OCTOBER 10,2017 <br /> While Lexington High School is now on par with the other school buildings pertaining to the CCTV sys- <br /> tem, great challenges remain with the ability to remotely lock doors as well as restricting visitor access. <br /> Gaps in the current security system at Lexington High School: <br /> • In the event of a lockdown, staff currently has to manually lock exterior doors,which is time con- <br /> suming,presents opportunities for errors, and could result in unsafe conditions in a security emer- <br /> gency. <br /> • The number of entrances is difficult to limit. In the Quad, exterior doors are required to be open <br /> during passing time so that students and staff can move between buildings. Currently there is no <br /> efficient or realistic system to unlock doors during `passing time' and to lock them afterwards <br /> when classes are in session. <br /> • Currently,visitors have unrestricted access throughout the campus. <br /> Estimated project costs: <br /> Request under this article <br /> Design, engineering, & architectural costs $31,000 <br /> Anticipated request for 2018 annual town meeting <br /> Architectural construction administration $8,600 <br /> Construction $330,000 <br /> Total anticipated 2018 ATM request $338,600 <br /> TOTAL ANTICIPATED REQUEST 2017 STM-3 +2018 ATM $369,600 <br /> Project Timeline: <br /> If the funding request under this article is approved, the design, engineering, and architectural work would <br /> begin immediately upon release of the funds. This work would include schematic design, design develop- <br /> ment,preparation of construction and bid solicitation documents, and updates of construction cost esti- <br /> mates. <br /> The plan would be to have construction documents completed, or close to completion,by the 2018 An- <br /> nual Town Meeting in April. This would allow an updated presentation to be made at the 2018 ATM in <br /> conjunction with a request for funds for construction and construction administration. <br /> If funding of the complete project is approved at the 2018 ATM,having already-completed design docu- <br /> ments will allow the bid process to begin immediately thereafter. This would allow a contractor to be on <br /> board by July 1, 2018 when the construction funds become available. The plan is to have an updated se- <br /> curity system substantially completed before the start of the 2018-2019 school year. <br /> The Committee recommends approval of this request(9-0). <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.