Laserfiche WebLink
APPROPRIATION COMMITTEE SPECIAL TOWN MEETINGS 2017-2&3 OCTOBER 10,2017 <br /> While Lexington High School is now on par with the other school buildings pertaining to the CCTV sys- <br /> tem, great challenges remain with the ability to remotely lock doors as well as restricting visitor access. <br /> Gaps in the current security system at Lexington High School: <br /> • In the event of a lockdown, staff currently has to manually lock exterior doors,which is time con- <br /> suming,presents opportunities for errors, and could result in unsafe conditions in a security emer- <br /> gency. <br /> • The number of entrances is difficult to limit. In the Quad, exterior doors are required to be open <br /> during passing time so that students and staff can move between buildings. Currently there is no <br /> efficient or realistic system to unlock doors during `passing time' and to lock them afterwards <br /> when classes are in session. <br /> • Currently,visitors have unrestricted access throughout the campus. <br /> Estimated project costs: <br /> Request under this article <br /> Design, engineering, & architectural costs $31,000 <br /> Anticipated request for 2018 annual town meeting <br /> Architectural construction administration $8,600 <br /> Construction $330,000 <br /> Total anticipated 2018 ATM request $338,600 <br /> TOTAL ANTICIPATED REQUEST 2017 STM-3 +2018 ATM $369,600 <br /> Project Timeline: <br /> If the funding request under this article is approved, the design, engineering, and architectural work would <br /> begin immediately upon release of the funds. This work would include schematic design, design develop- <br /> ment,preparation of construction and bid solicitation documents, and updates of construction cost esti- <br /> mates. <br /> The plan would be to have construction documents completed, or close to completion,by the 2018 An- <br /> nual Town Meeting in April. This would allow an updated presentation to be made at the 2018 ATM in <br /> conjunction with a request for funds for construction and construction administration. <br /> If funding of the complete project is approved at the 2018 ATM,having already-completed design docu- <br /> ments will allow the bid process to begin immediately thereafter. This would allow a contractor to be on <br /> board by July 1, 2018 when the construction funds become available. The plan is to have an updated se- <br /> curity system substantially completed before the start of the 2018-2019 school year. <br /> The Committee recommends approval of this request(9-0). <br /> 21 <br />