APPROPRIATION COMMITTEE SPECIAL TOWN MEETINGS 2017-2&3 OCTOBER 10,2017 <br /> would cover the previous and present requests for design funds, which will be financed in the interim by <br /> short-term,interest-only bond anticipation notes (BANs), as well as the expenses for subsequent phases of <br /> the project including the costs of swing space. In the event that a debt exclusion for the fire station is not <br /> approved by voters this fall or in the next year or two,the fire station replacement will not proceed,the debt <br /> approved under this article would not be incurred,and the debt service for the previously approved$450,000 <br /> for design work would be funded from the non-exempt tax levy. In that case the Fire Headquarters would <br /> continue to work in the current facility. <br /> If both this article and the debt exclusion for the project are approved, an appropriation for the balance of <br /> the costs of the replacement of the facility will be sought in the spring of 2018 at the annual or at a special <br /> town meeting. <br /> If all approvals are granted according to the anticipated schedule, the new Fire Headquarters station would <br /> likely be available for occupancy in late 2019 or early 2020. <br /> It is appropriate to describe the approximate impact on property taxes if this project moves forward. The <br /> estimate made here assumes that the cost of the land purchase is covered within the non-exempt tax levy, <br /> and that the overall cost of the facility replacement together with swing space, exclusive of the cost of <br /> acquiring the site and building at 173 Bedford St. and debt service interest,is approximately $22,000,000. <br /> The estimate assumes that the cost is funded through debt with a term of 30 years at an effective interest <br /> rate of 4%. With these assumptions, the principal payment would be about $730,000 per year and the <br /> interest cost would be, in the first full year of debt service, about $880,000. The sum of principal and <br /> interest payments in the first full year of debt service thus represents just under 1% of the non-exempt <br /> property tax revenue that will likely be raised in that year. The annual interest cost would decline over the <br /> 30-year term to about$30,000 in the final full year of debt service. <br /> This Committee agrees that it is important for the Town to proceed with this project so that Fire Department <br /> personnel will have a facility that allows them to efficiently carry out their responsibilities and to provide <br /> residents and businesses with high quality fire prevention and suppression services. <br /> The Committee recommends approval of this request(9-0-0). <br /> Article 2016-2.5: Appropriate for Temporary Fire Station Construction <br /> Funds Requested Funding Source Committee Recommendation <br /> $2,140,000 Excluded Debt Approve(9-0-0) <br /> This article seeks an appropriation of$2,140,000 for design,engineering,and architectural services,includ- <br /> ing production of construction documents, and for the construction of a temporary fire station at 173 Bed- <br /> ford Street,including signalization and access improvement. <br /> Late in 2016,the Town purchased the Liberty Mutual land and building at 173 Bedford St.at the negotiated <br /> price of$4,300,000. The site and building were acquired for a temporary fire station that will be used while <br /> the current building is demolished and replaced with a new fire station(see Article 4 above for details). In <br /> addition to the amount of the purchase price, at the Special Town Meeting 2016-5 held in September,2016, <br /> $58,000 was appropriated for legal, survey, and environmental costs and $85,000 was appropriated for <br /> preliminary engineering studies in regard to the temporary facility. <br /> Under Article 3 of Special Town Meeting 2017-1 held on March 20, 2017, $50,000 was appropriated for <br /> the design development phase of the temporary fire headquarters at 173 Bedford Street location. The esti- <br /> mated total cost of the project at that time was $2,093,000.The design phase has been completed by Tecton <br /> 13 <br />