Laserfiche WebLink
periphery of the Hanscom base, but those looking for space are surprised at the per square <br />foot price which can be upwards of $34.00. <br />Mr. Pronchick also reported that he attended a Department of Defense symposium in <br />Washington, D.C.. He provided Melisa Tintocalis with some reference materials. Mr. <br />Pronchick advised that it would be wise for towns that border bases to track BRAC <br />discussions and be involved in the discussions. <br />King Street – New Building Proposal for 45-55-65 Hayden Avenue Campus <br />Rob Albro, a managing director at King Street Properties, introduced himself and <br />presented the company’s proposed project at 45-65 Hayden. The project proposal is the <br />development of a new 200,000 square foot lab-capable building and an accompanying <br />seven story parking garage; the project would require an amendment the zoning at 45-65 <br />Hayden by Town Meeting which they are expected to attend in October. <br />Mr. Albro reported that the parking ratio use for the project was approximately 2.5 spaces <br />per 1,000 square feet. Narain Bhatia inquired how much the parking structure cost per <br />space, however, Mr. Albro did not have that information at the time. <br />The committee members discussed the general market conditions that would make the <br />project viable including Lexington’s location to draw in further out suburban tenants and <br />those needing more space as they grow out of Cambridge or Dry Dock. <br />A motion was made by Larry Smith to support and recommend the project to the Board <br />of Selectmen and it passed unanimously <br />th <br />Joint Board of Selectmen and Planning Board Meetings on August 28 <br />Melisa Tintocalis reported that there a joint Board of Selectmen and Planning Board <br />th <br />meeting scheduled on August 28 to review an overlay zoning concept at Hartwell and <br />Bedford, and possibly Forbes Road. The committee reviewed the maps of the area and <br />discussed opportunities for development. The general consensus was that Forbes may <br />have significant build-out capacity. Larry Smith offered to reach out to BAE systems to <br />inquire about their plans for the future. <br />Adjournment: The meeting adjourned at 9:45 a.m. <br />Next Meeting: September 19, 2017 <br />Approved on: <br />