|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2014-03-05-CCAC-rpt
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
DISSOLVED COMMITTEES
>
Ad hoc Community Center Advisory Committee, Ad hoc - CCAC (2013-
>
Minutes
>
2014
>
2014-03-05-CCAC-rpt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2018 4:23:30 PM
Creation date
9/19/2017 10:46:45 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
vvnat is roc <br />• Neither a 250 kw generator nor a 450 kw generator (required to maintain <br />environmental conditions) since the installed cost of the small generator <br />exceeds $500,000. <br />• An integrated manual transfer switch with distribution for connection of a <br />portable 250 kw generator, as installed cost exceeded $250,000. <br />• Additional insulation in wall cavities. It was estimated that, due to the amount of <br />wood trim and detailing, opening the walls, replacing the insulation with foam <br />to increase the R value from 19 to 30 would cost over $850,000, but yield only <br />$47/yr in savings. <br />• Similarly, adding additional batt insulation above the ceiling to increase R - <br />value from 30 to 50 would cost approximately $50,000 and yield only $10/yr in <br />savings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.