Laserfiche WebLink
0 <br />X13 - -- <br />17, <br />PROPOSED SEWER DROP MANHOLE _ <br />INVERT IN= MATCH IN FIELD <br />INVERT IN(DROP)= 201.00 <br />INVERT OUT= 200.32 <br />__- <br />ow _ <br />1 <br />\ <br />\ <br />1 <br />SMH <br />J1 <br />1=200.1 - - - - - _ _ _ % PPROX RO W <br />- 1 =205. - - <br />-� -� 1= 205.215 <br />\ \ MODIFY EXISTING SEWER <br />DROP MANHOLE TO <br />— INCORPORATE PROPOSED " D n/ <br />h 8 —INCH PVC SEWER LINE-- — �2 RX TlL F �i 1 01 V W/1 TE <br />RI�IAIIV <br />�AC WV <br />SEWcR _ - - - - -� <br />I — — — _ <br />— PROPOSED 8 —INCH PVC SEWER LINE WITHIN 6 CAST IRON (ABAX olvg) SMH z <br />12 -INCH STEEL SLEEVE BENEATH CULVERT — — — — — — — -- — R= 211.J1 <br />— — — <br />r _ <br />1-206.0/ <br />s=:r <br />APPROX. L OCA TION OF <br />EXISTING 8" A C SEWER <br />MAIN CLASS 2400 <br />APPROX. TOP OF PIPE <br />EL E l/A TION = 202.00 <br />REVERE STREET PROPOSED SEWER MAIN MODIFICATIONS <br />SCALE 1 " = 8' <br />215. ,. <br />PROPOSED 12-INCH -, <br />'RCP DRAIN LINE - PROPOSED CONCRETE BOX CULVERT <br />CIA, PPROX. INV= 210.28. - <br />210, <br />O EXISTING SEWER <br />- DROP MANHOLE '- <br />PROPOSED SEWER DROP MANHOLE - <br />INV. = 205.34 (APPROX,)_. _ <br />IN FIELDMATCH <br />EXISTING SEWER LINE IN PLUG OPENING — <br />_ — <br />205 EXISTING 8' AC SEWER MAIN— -- PORTIONS OF EXISTING 8" AC SEWER <br />EXISTING B" AC SEWER MAIN <br />...CLASS 2400 ... <br />TRANSITION COUPLIN _ .. :. I _ <br />MAIN TO BE <br />"REMOVED AND DISPOSED IN ACCORDANCE WITH <br />ALL APPLICABLE REGULATIONS (SEE NOTE 2). <br />PROPOSED 8" PVC DROP O <br />`CONNECTION (SEE DETAIL) - - SLOPE = 0.005. <br />.INV.' =20 <br />200 INV -20032 -- <br />- .INV. = 200.11, <br />PROPOSED 8" PVC SEWER MAI 7 PROPOSED 8 -INCH SEWER MAIN TO BE CENTERED <br />WITHIN PROPOSED 12 -INCH STEEL CASING USING; <br />STAINLESS5TEEL CASING SPACERS. CASING SHALL BE <br />SEALED AT BOTH ENDS USING MECHANICAL LINK SEAL. <br />0 _. id 20 _ 3e .. 40... -.. _. 50 .. 60 _ ... 70. 60 90 100 <br />NOTES: <br />1) ANNULAR SPACE WITHIN STEEL CASING TO BE <br />FILLED WITH PROCESSED SAND. <br />2) REMOVAL OF ASBESTOS CEMENT (AC) MATERIALS <br />SHALL FOLLOW REGULATIONS OUTLINED WITHIN <br />CONTRACT DOCUMENTS - SPECIAL PROVISIONS. <br />SEWER PROFILE <br />4 2 0 4 8 8 4 0 8 16 <br />Vertical Scale 1 " =4' Horizontal Scale 1" = 8' <br />ANNULAR SPACE FILLED <br />WITH PROCESSED SAND <br />A PPRO <br />X _1�_O_I!V21 <br />12" STEEL CASING <br />8" SEWER PIPE <br />STAINLESS STEEL <br />CASING SPACER (TYP.) <br />SEWER CASING PIPE SECTION <br />NOT TO SCALE <br />+ >'4 Iii QF� + +' " +a <br />.?� htatth .y <br />U n m <br />"v 1 II <br />c> <br />do. 4080 <} <br />lb 'F <br />s T` G <br />+��+ "IFIYiA tli VJ +' <br />P.E. STAMP <br />GENERAL NOTES <br />1. DRAWINGS BASED ON TOPOGRAPHIC <br />SURVEY CONDUCTED IN SEPTEMBER 2013 <br />BY GCG ASSOCIATES, INC. ELEVATIONS <br />SHOWN HEREON ARE REFERENCED TO <br />THE NORTH AMERICAN VERTICAL DATUM <br />OF 1988 (NAVDB8). <br />2. STREET LINES AND PROPERTY LINES <br />ARE BASED ON SURVEY CONDUCTED IN <br />SEPTEMBER 2013 BY GCG ASSOCIATES, <br />INC. <br />3. WETLAND DELINEATION PERFORMED <br />ON MARCH 27, 2013 BY COMPREHENSIVE <br />ENVIRONMENTAL, INC. <br />4. ROADWAYS AND DRAINAGE STRUCTURE <br />LOCATIONS DEPICTED ON THIS MAP ARE <br />APPROXIMATE AND MUST BE VERIFIED BY <br />THE CONTRACTOR. THE LOCATION AND <br />DEPTH OF DRAINAGE PIPES SHOWN ON <br />THESE PLANS ARE APPROXIMATE AND <br />SHALL BE VERIFIED BY THE CONTRACTOR <br />PRIOR TO CONSTRUCTION. <br />5. UTILITY LOCATIONS DEPICTED ON THIS <br />MAP ARE APPROXIMATE AND MUST BE <br />VERIFIED BY THE CONTRACTOR. THE <br />LOCATION AND DEPTH OF WATER & <br />SEWER PIPES SHOWN ON THESE PLANS <br />ARE APPROXIMATE AND SHALL BE <br />VERIFIED BY THE CONTRACTOR PRIOR TO <br />CONSTRUCTION. <br />6. THE CONTRACTOR SHALL (EXERCISE <br />EXTREME CAUTION TO PREVENT ANY <br />DAMAGE TO ADJACENT PROPERTIES. ALL <br />AREAS WHICH ARE AFFECTED BY THE <br />CONTRACTOR'S OPERATIONS SHALL BE <br />RETURNED TO THEIR ORIGINAL CONDITION <br />OR BETTER, AT NO ADDITIONAL COST TO <br />THE OWNER. <br />7. ANY CHANGE IN FIELD CONDITIONS <br />SHALL BE REPORTED TO THE ENGINEER <br />TO INSURE THAT ANY MODIFICATIONS TO <br />THE ORIGINAL DESIGN ARE PROPER AND <br />ADEQUATE TO SERVE THE PROJECT'S <br />NEEDS AND COMPLY WITH THE <br />APPLICABLE STANDARDS AND <br />REGULATIONS. <br />8. CONTRACTOR SHALL IMMEDIATELY <br />REPAIR OR FILL ANY POTHOLES THAT <br />OCCUR DUE TO CONSTRUCTION. <br />No. I Revision /Issue I Date <br />COMPREHENSIVE ENVIRONME T� <br />INCORPORATED <br />225 CEDAR HILL ST. <br />MARLBOROUGH, MA 01752 <br />REVERE STREET <br />N. LEXINGTON 13ROOK <br />CULVERT REPLACEMENT <br />PROPOSED SANITARY SEWER <br />PROFILE <br />Town of Lexington, MA <br />ORI - it <br />Project No.: 228 -4 <br />Date: FEBRUARY 2015 <br />Sheet <br />\J <br />Drawn By: SCS <br />Checked By: MILL <br />Scale: AS SHOWN <br />ORI - it <br />