Laserfiche WebLink
MINUTES LEXINGTON CONSERVATION COMMISSION SEPTEMBER 19, 2000 <br /> Commissioners present: Bebe Fallick, Lisa Baci, Duke Bitsko, Philip Hamilton, and Joyce <br /> Miller. Absent: Angela Frick and Dick Wolk. <br /> Others present: Marilyn Nordby and Linda Gaudet. <br /> Chairman Miller called the meeting to order at 7:50 p.m. in Room G-15, Town Office Building. <br /> High School Drainage Plan - 201-438 <br /> At a previous meeting Dan Vallee stated that the installation of the entire drainage system cannot <br /> be completed for two years because of project phasing. He reviewed a temporary drainage plan <br /> to mitigate stormwater runoff from the new pavement installed on the Waltham Street side of the <br /> parking lot. An orifice on the existing pipe will reduce the speed of stormwater outflow through <br /> the pipe. Overflow or backup will be directed to a detention pond which will serve as a <br /> temporary storage area. A 10x20 by 6" deep spillway filled with crushed stone between CB 257 <br /> and the storage pond is also proposed. The contractor does not plan to install curbing along the <br /> access driveways until next spring. The Commission required that the curbing must be installed <br /> by April and they approved the proposed temporary solution pending the Town Engineer's <br /> approval. The installation of the 11-inch orifice and surface storage area should be completed no <br /> later than October 31, 2000 The Commission requested that a plan and a work schedule with <br /> specifics be submitted to the Office. <br /> It was moved, seconded and voted(Ms. Baci abstained)to approve as a field change the <br /> proposed interim stormwater mitigation system as stated above, and to require that the curb <br /> along the road south of building A be installed by April 15, 2001 <br /> HEARING, 32 LINCOLN STREET J Rhodin,Addition - 201-476 <br /> Present: Mac McDowell,Noonan& McDowell, Jeffrey Rhodin, applicant. Others are listed in <br /> the file. <br /> Mr McDowell presented a plan for the construction of an addition, garage and driveway to an <br /> existing home at 32 Lincoln Street. The addition is located 80 feet from the Bordering Vegetated <br /> Wetland. The wetlands were flagged on 5/8/00 by LEC and the report is on file. Runoff from <br /> the yard and roof will be directed to an infiltration and leaching trench to mitigate an increase in <br /> stormwater runoff during all storm events. A test pit was dug to determine the soils information. <br /> Mrs. Miller read the engineering report which finds that the design was prepared using standard <br /> and accepted engineering practice and concurs with the engineer's methods and conclusions. <br /> In response to questions from the Commission Mr. Rhodin said that the wetlands line has not <br /> changed much from his previous submittal. The infiltrator trench, constructed in 1993, will <br />