Laserfiche WebLink
MINUTES - LEXINGTON CONSERVATION COMMISSION MAY 23, 2000 <br /> Commissioners present: Lisa Baci, Duke Bitsko, Angela Frick, Joyce Miller and Richard Wolk. <br /> Absent: Bebe Fallick and Philip Hamilton. <br /> Others present: Marilyn Nordby and Linda Gaudet. <br /> Chairman Miller called the meeting to order at 7:50 p.m. in Room G-15, Town Office Building. <br /> Discussion. Clarke Middle School Temporary Modular Classroom (201-439) <br /> Dan Vallee, Asst. Town Engineer, presented a plan for the installation of temporary modular <br /> classrooms at the Clarke Middle School to be used for the duration of the school renovation <br /> construction. The units will be located on an existing grassed area and supported on sona tubes. <br /> After discussion, the Commission directed that a french drain must be installed between the units <br /> and the paved area and that hay bales must be installed between the units and the brook during <br /> the installation. It was moved, seconded and voted (Ms. Baci abstained)to accept the above <br /> plan with the appropriate erosion controls as a field change to the school's renovation plans. <br /> HEARING for ANRAD Lot 3 Hartwell Avenue. Magnus Engineering Services. 8.15 pm <br /> Wetlands boundary <br /> The hearing for the determination of the wetlands boundary on lot 3, Hartwell Avenue, was <br /> opened. The applicant was not present and no testimony was given. Mrs. Miller said that based <br /> on the review of the line at the Saturday site visit, there were outstanding questions regarding the <br /> line as delineated which required meeting with the consultant at the site for more information. <br /> Mrs. Miller read an agreement from the applicant requesting a continuance to June 6. It was <br /> moved, seconded and voted to continue the hearing to June 6, 2000, at 7.45 p.m. <br /> Report - Metromedia—Fiber Optic Cable Installation alone the Bike Path - 201-464 <br /> Mr. Bitsko reported that at the Board of Selectmen's meeting the Selectmen voiced a strong <br /> opinion to the legal counsel of Metromedia that a third conduit should be installed along the Bike <br /> Path while they are doing their work to install their cable. Metromedia has not agreed to this <br /> option to date but will review the option again and respond at a future Selectmen meeting. <br /> Order of Conditions. Rte. 2/95 Level (3) Communications. Fiber Optic Cable - 201-468 <br /> It was moved, seconded and unanimously voted to approve the Order of Conditions for Level (3) <br /> Communications as amended. <br /> Order of Conditions. 57 Solomon Pierce Road - 201-465 <br /> It was moved, seconded and unanimously voted to approve the Order of Conditions for 57 <br /> Solomon Pierce Road as amended. <br />