Laserfiche WebLink
MINUTES - LEXINGTON CONSERVATION COMMISSION FEBRUARY 1, 2000 <br /> Commissioners present: Lisa Baci, Duke Bitsko, Angela Frick, Philip Hamilton and Joyce <br /> Miller. Absent: Bebe Fallick and Richard Wolk. <br /> Others present: Marilyn Nordby and Linda Gaudet. <br /> Chairman Miller called the meeting to order at 7 45 p.m. in Room G-15, Town Office Building. <br /> Continued Hearings Discussion - Commissioners noted that having to continually schedule <br /> continued hearings without presentations for large projects such as Winning Farm and Old Smith <br /> Farm is disruptive to basic meeting scheduling and a problem for abutters. It was decided that <br /> hearings for large projects should not be randomly continued and should be scheduled only when <br /> material has been submitted and reviewed by Engineering. <br /> Extension Permit Starwood Lexington-Sheraton Inn (201-3911 <br /> John Farrington,Attorney, and Julie Campisani, General Manager, were present. <br /> Mr. Farrington explained that the original Order of Conditions was issued for the property in <br /> ( 1992. In 1997 there was a new submission and a new Order of Conditions issued. An <br /> Il Amendment of the plan, which addressed the concerns of the Design Advisory Committee about <br /> moving a parking area off an existing pine knoll so the trees would not have to be destroyed, was <br /> submitted and approved by the Commission in July 1997 If the Commission is reluctant to <br /> extend the Order for three years, they would like to have it extended to expire on May 16, 2001, <br /> concurrently with the Special Permit by the Board of Appeals. The Hotel will honor the <br /> commitment for the walking trail connection to the National Park. Mr. Farrington said that <br /> although the Flatley Co. had not been actively involved with the Marrett Road project, Starwood <br /> wants to be and is in the process of getting all the information together so they can coordinate <br /> with the project. <br /> Ms. Baci recalled that the Commission reluctantly agreed to some conditions that were <br /> undesirable and wondered if the Commission had an opportunity to comment on the latest Board <br /> of Appeals decision. She pointed out that at the time the last Order was issued, there were <br /> several important issues to be negotiated at the front of the property regarding the driveway and <br /> landscaping, and she would like to know the decisions that have been made. Mr. Farrington <br /> reiterated that the hotel has signed all the documents required of the hotel regarding giving land <br /> for the Marrett Road project. The work on the Marrett Road side of the hill is a separate project <br /> from the Sheraton work. That work is under the jurisdiction of MHD and DEP Ms. Baci wants <br /> to look at the entire parcel and the wetlands to see if anything significant has changed before <br /> agreeing to an Extension of the Order. Mr. Farrington said that the 1997 wetlands line on the <br /> Sheraton plan was identical to the 1992 line and was approved by the Commission in 1997 The <br /> original wetlands flags are gone but will be replaced prior to any work on the property Mr. <br /> Hamilton suggested that the Extension should be permitted to the Board of Appeals deadline in <br />