|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2024-03-25-ConCom-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Conservation Commission-ConCom
>
Minutes
>
2024
>
2024-03-25-ConCom-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2024 10:47:16 AM
Creation date
4/23/2024 12:43:48 PM
Metadata
Fields
Template:
Archives
Year
2024
Author or Source
Megan Downer, LUHD Staff
Department
Town Clerk
Keywords or Subject
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: razing and reconstruction of a single- family home and installation of bituminous <br />concrete driveway and stormwater infiltration system within the 100-foot buffer zone to <br />Bordering Vegetated Wetlands <br />Documentation Submitted: <br /> Notice of Intent Application; Prepared by: D. Michael, Marsh Matters Environmental; <br />Date: 3/5/2024; <br /> “Plan for Proposed Building and Average Natural Grade Worksheet”; Prepared and <br />Stamped by: William E. Tirrell, PLS#49930; Date: 3/5/2024; <br /> “Proposed Utility Site Plan, Proposed Infiltration System Details, and Proposed <br />Construction Details”; Prepared and Stamped by Patrick L. Bower, CE#48026; Date <br />3/5/2024 <br /> Stormwater Management Report; Stamped by Patrick L. Bower, CE#48026; Prepared by <br />Amoskeag Engineering Consultants, PLLC; Date 12/21/23; Date Last Revised 3/4/2024 <br /> Form 11 – Soil Sustainability Assessment for On-Site Drainage System; Prepared by <br />Greg Saab; Date 12/15/2023 <br /> Bordering Vegetated Wetland Determination Form; Prepared by: MME, M. Ball, <br />Wetland Sci.; Date: 8/24/2023 <br /> “NOI Cover Letter”; Prepared by: Michael Ball, Sr. Wetland Scientist, Marsh Matters <br />Environmental; Date: 3/5/2024 <br /> <br />Mr. Mike Ball, Marsh Matters Environmental, presented, on behalf of the applicant, the proposal <br />to raze and rebuild a single-family dwelling. Mr. Patrick Bower, civil engineer, and Mr. Renan <br />Barreto, applicant, were also in attendance. Mr. Ball stated that there will be no mature tree <br />removal; however, pruning from trees nearest the new structure may be required. Mr. Barreto has <br />created an architectural plan not submitted with the NOI. The architectural plan must be <br />submitted on the record in order to be considered as part of the property’s plans. <br /> <br />Mr. Bower presented the proposed stormwater management plan with stormwater mitigation <br />through two Cultec infiltration systems and the permeable paver driveway. Mr. Bower also <br />stated that new information about the calculations in the pre-development condition will be <br />submitted. However, these calculations will not cause any changes to the proposed plans. <br /> <br />The Commission had questions about the plan such as roof overhang and the plans around the <br />pool which can be addressed once the architectural plan has been submitted to the record. Ms. <br />Mullins asked for clarification that the pool is considered impervious in the calculations. Mr. <br />Bower confirmed that the pool is considered impervious. <br /> <br />On a motion by Ms. Ladd and seconded by Ms. Dohan, the Commission voted 7-0 by roll call <br />vote to continue the hearing to the 4/8/2024 meeting, at the applicant’s request. <br /> <br />Record of Vote as Follows: <br /> <br />Kevin Beuttell – Aye <br />Duke Bitsko – Aye <br />Alex Dohan – Aye <br />Ruth Ladd – Aye <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.