|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2024-03-25-ConCom-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Conservation Commission-ConCom
>
Minutes
>
2024
>
2024-03-25-ConCom-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2024 10:47:16 AM
Creation date
4/23/2024 12:43:48 PM
Metadata
Fields
Template:
Archives
Year
2024
Author or Source
Megan Downer, LUHD Staff
Department
Town Clerk
Keywords or Subject
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Philip Hamilton – Aye <br />Jason Hnatko – Aye <br />Tom Whelan – Aye <br /> <br />7:46 PM <br /> <br />Request to Amend the Order of Conditions: 4 Saddle Club Road <br />OpenGov Permit# AOOC-24-1, CNOI-23-22, DEP# 201-1299 <br />Applicant/Property Owner: Jason Brickman <br />Project: modifications to construct a third garage bay and expand the driveway area, resulting in <br />a 636 sf increase in impervious surface within the 200-foot Riverfront Area <br />Documentation Submitted: <br /> Letter Describing Requested Amendment; Prepared by: LEC Environmental Consultants, <br />Inc.; Date: 3/5/2024; <br /> “4 Saddle Club Road, Lexington, MA”; Prepared by: Patriot Engineering; Date: <br />8/18/2023; Revised Last Date: 2/27/2024 <br /> Stormwater Calculations; Prepared by: Patriot Engineering; Stamped by: Michael J. <br />Novak, Patriot Engineering, CE#50696; Date: 8/18/2023; Revised: 2/28/2024 <br /> “Riverfront Area and Buffer Zone Mitigation Planting Plan”; Prepared by LEC; 3/11/24 <br />Supplemental Documentation Submitted: <br /> Engineering Comments; Prepared by Marissa Liggiero; Date: 3/22/2024 <br /> Site planting plan; Prepared by: LEC Environmental Consultants, Inc.; Date: 3/18/2024 <br /> <br />Mr. Richard Kirby, LEC Environmental, presented this as a modification to the proposal for the <br />demolition and reconstruction of a single-family house, portions of which are within the 200-foot <br />Riverfront Area. Mr. Michael Novak, Patriot Engineering, submitted a revised stormwater <br />management report and revised stormwater infiltration details. Mr. Kirby stated that the proposed <br />plan consists of enhancement plantings, rebuilding the structure further from the Riverfront Area, <br />and revegetation in the Riverfront Area. The proposed plan includes a 2:1 ratio of Riverfront <br />Area restoration to mitigate for the increased structure and pavement. <br /> <br />Mr. Bitsko asked for clarification of whether the proposed third bay is closer to the wetland than <br />the existing house. Mr. Kirby stated that the third bay is closer to the wetland. The engineering <br />letter submitted stated that the stormwater infiltration details were not shown on the plan. Mr. <br />Kirby stated the details are shown on the plan and the Commission requests confirmation of the <br />engineering reviewer’s comment on the details shown. <br /> <br />On a motion by Ms. Ladd and seconded by Mr. Beuttell, the Commission voted 7-0 by roll call <br />vote to close the hearing with the condition that engineering staff confirm that the required <br />stormwater infiltration details were present. <br /> <br />Record of Vote as Follows: <br /> <br />Kevin Beuttell – Aye <br />Duke Bitsko – Aye <br />Alex Dohan – Aye <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.