|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2024-03-25-ConCom-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Conservation Commission-ConCom
>
Minutes
>
2024
>
2024-03-25-ConCom-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2024 10:47:16 AM
Creation date
4/23/2024 12:43:48 PM
Metadata
Fields
Template:
Archives
Year
2024
Author or Source
Megan Downer, LUHD Staff
Department
Town Clerk
Keywords or Subject
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Erickson presented that the intention of the Affordable Housing Trust is to keep the wetlands <br />undisturbed. The Commission will conduct a site visit to view the standing water in question and <br />confirm if the location is a wetland and if it is off property. <br /> <br />On a motion by Ms. Ladd and seconded by Mr. Hnatko, the Commission voted 7-0 by roll call <br />vote to continue the hearing to the 4/8/2024 meeting at the applicant’s request. <br /> <br />Record of Vote as Follows: <br /> <br />Kevin Beuttell – Aye <br />Duke Bitsko – Aye <br />Alex Dohan – Aye <br />Ruth Ladd – Aye <br />Philip Hamilton – Aye <br />Jason Hnatko – Aye <br />Tom Whelan – Aye <br /> <br />7:26 PM <br /> <br />Request for Determination of Applicability: 13 Drummer Boy Way <br />OpenGov Permit# CDOA-24-1 <br />Applicant/Property Owner: Drummer Boy Homes Association, Inc. <br />Project: installation of new area drains with drain connection to existing municipal storm drainage <br />system outside of the 100-foot buffer zone to Bordering Vegetated Wetlands <br />Supplemental Documentation Submitted: <br /> Determination of Applicability Application; Prepared for: Drummer Boy Association; <br />Date: 2/29/2024; <br /> Site Plan; Prepared and Stamped by: Bert E. Corey CE#48423; Date: 3/1/2024; <br /> Detailed Project Description; Prepared by: Kevin Riopelle, Project Manager; Signed by: <br />Bert E. Corey, P.E.; Date: 3/1/2024 <br /> Engineering Comments; Prepared by: Marissa Liggiero; Date: 3/22/2024 <br /> <br />Mr. Hamilton recused himself from the discussion and the decision of this application. Mr. <br />Kevin Riopelle, DGT Associates, civil engineer for the project, presented the project is in Cluster <br />11 of 13 Drummer Boy Way to address ponding and water accumulation. Mr. Riopelle presented <br />the proposal is to install four interconnected area drains, connected to an existing catch basin that <br />discharges towards the wetlands area. Mr. Riopelle stated that the amount of flow will not <br />change and the location is not conducive to installing an infiltration system. <br /> <br />On a motion by Ms. Dohan and seconded by Mr. Beuttell, the Commission voted 6-0 by roll call <br />vote to issue a Negative Determination with conditions. <br /> <br />Record of Vote as Follows: <br /> <br />Kevin Beuttell – Aye <br />Duke Bitsko – Aye <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.