Laserfiche WebLink
Ms. Karen Mullins provided a report to the commission stating that LEC has been engaged by <br />the owner. LEC will create a surveyed plan and develop a stormwater management plan to <br />address the restoration after the removal of trees and vegetation in the 200-foot Riverfront Area. <br />Staff will update the Commission when the restoration plan is ready to be discussed at a further <br />date. <br /> <br />Vote to Issue Order of Conditions: 65 Winter St, OpenGov Permit# CNOI-24-4, DEP # 201- <br />1313 <br />On a motion by Ms. Dohan and seconded by Mr. Beuttell, the Commission voted 7-0 by roll call <br />vote to issue the Order of Conditions. <br /> <br />Record of Vote as Follows: <br /> <br />Kevin Beuttell – Aye <br />Duke Bitsko – Aye <br />Alex Dohan – Aye <br />Ruth Ladd – Aye <br />Philip Hamilton – Aye <br />Jason Hnatko – Aye <br />Tom Whelan – Aye <br /> <br />6:41 PM <br /> <br />Vote to Issue Order of Conditions: 6 Vaille Ave, OpenGov Permit# CNOI-24-5, DEP # 201- <br />1311 <br />On a motion by Ms. Dohan and seconded by Ms. Ladd, the Commission voted 7-0 by roll call <br />vote to issue the Order of Conditions. <br /> <br />Record of Vote as Follows: <br /> <br />Kevin Beuttell – Aye <br />Duke Bitsko – Aye <br />Alex Dohan – Aye <br />Ruth Ladd – Aye <br />Philip Hamilton – Aye <br />Jason Hnatko – Aye <br />Tom Whelan – Aye <br /> <br />6:42 PM <br /> <br />Request for Full Certificate of Compliance: 87 Westview St, DEP 201-460, BL 418, Opengov <br />COC-24-4 <br />Ms. Mullins stated that owner submitted a request for the certificate of Compliance along with an <br />as-built plan. The project consisted of the construction of an addition over an existing driveway, <br /> <br />