Laserfiche WebLink
General consensus from the Town is detouring traffic off Mass Ave doesn’t have town support? <br />Betty asked how they determined there was no support from the Town – <br />Answer is the initial consultation with Engineering and Traffic Department <br /> <br /> <br /> <br />Alternative 3 – Initially looking to construct in the winter but the lex 2025 then they created an <br />alternate scheduled of construction after 2025. <br />Now they looked at starting Maple St right after Lex April 2025 and then do the bikeway usage <br />from Nov – May in 2025 <br />Weekend usage is about triple the weekday use – <br />Then it would be possible to open the bikeway to weekend traffic – creating a surface RAP – <br />and create signage <br />When bikeway is restored, it will be 12 feet wide and RAP will be on either side <br />Permanent restoration is to duplicate <br />12 foot wide with 2 feet RAP on either side of the paveway <br />Temporary weekend will be back to 12 feet also <br />