|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2024-02-08-LBAC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Lexington Bicycle Advisory Committee-LBAC
>
Minutes
>
2024
>
2024-02-08-LBAC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 2:37:59 PM
Creation date
4/4/2024 5:33:37 PM
Metadata
Fields
Template:
Archives
Year
2024
Author or Source
Betty Gau, Committee Member
Department
Town Clerk
Keywords or Subject
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
General consensus from the Town is detouring traffic off Mass Ave doesn’t have town support? <br />Betty asked how they determined there was no support from the Town – <br />Answer is the initial consultation with Engineering and Traffic Department <br /> <br /> <br /> <br />Alternative 3 – Initially looking to construct in the winter but the lex 2025 then they created an <br />alternate scheduled of construction after 2025. <br />Now they looked at starting Maple St right after Lex April 2025 and then do the bikeway usage <br />from Nov – May in 2025 <br />Weekend usage is about triple the weekday use – <br />Then it would be possible to open the bikeway to weekend traffic – creating a surface RAP – <br />and create signage <br />When bikeway is restored, it will be 12 feet wide and RAP will be on either side <br />Permanent restoration is to duplicate <br />12 foot wide with 2 feet RAP on either side of the paveway <br />Temporary weekend will be back to 12 feet also <br />
The URL can be used to link to this page
Your browser does not support the video tag.