Laserfiche WebLink
Status:Construction underway <br /> Estimated Project Completion Date:Fall 2024 <br /> Funding:ATM 2018-Article 14/STM 2021-1 Article 5a/STM 2022-1 Article 2/ATM 2023 Article 16(i) <br /> The new Police Station facility is being constructed in compliance with the Towri s Integrated Building <br /> Design and Construction Policy and will be solar ready in furtherance of the Towri s net zero renewable <br /> energy policy goals.The building design and construction includes all of the infrastructure necessary to <br /> support onsite solar energy generation and energy storage systems designed to reduce the building's <br /> energy consumption and peak demand charges,while improving the building's resilience in the event of <br /> Ipower�.���������������������,���_�,���enabling high speed electric vehicle charging for the Police Department's <br /> electric vehicle fleet. <br /> The solar energy canopy design went through an extensive public process to secure approval of a design <br /> that is appropriate for the neighborhood and meets the requirements of the Historic Districts Commission. <br /> The Historic Districts Commission issued a Certificate of Appropriateness in November 2023. <br /> Construction of the footings for the canopy have begun. Solar canopy and energy storage system <br /> construction is expected to be completed by the Fall of 2024 with a goal of having the solar canopy project <br /> completed at the same time as the Police Station to maximize efficiencies with the site contractor. <br /> Old Reservoir Bath House Renovation <br /> Appropriation:$620,000 <br /> Funding:ATM 2019-Article 14g <br /> Initial bids received by the Town exceeded the appropriation approved by Town Meeting. The <br /> Department of Public Facilities and Recreation Department staff proposed design changes and <br /> procurement alternatives to lower overall project costs.DPF went out to bid a second time and the bids <br /> received were still well above the appropriation approved by Town Meeting. The Recreation Committee <br /> is reviewing the current status and deliberating on next steps for this project. <br /> Center Bathroom&Maintenance Building Renovation <br /> Appropriation:$780,000 <br /> Proj ect Completion Date:October 2024 <br /> Funding:ATM 2020-Article 16b/ATM 2021-Article 16g/ATM 2022-Article 10e <br /> 2020 Annual Town Meeting approved$100,000 in design and engineering funds for the Center Bathroom <br /> building renovation project.At the 2021 Annual Town Meeting,the Select Board recommended indefinite <br /> postponement of warrant article 16g requesting $915,000 in construction funding to a future Town <br /> Meeting. 2022 ATM approved warrant article 10e requesting$680,000 in funding for this project. The <br /> I renovation of the Center Bathroom facility was����-�-��-�;:��:����;, ���„�������,�.��,October 2024. <br /> ... . . . <br /> � �.�� � ���.� ...� � . ��..��.. �� <br /> There are six home rule petition requests approved at recent Town Meetings that remain under <br /> consideration by the legislature.No final action has been taken by the legislature on any of these petitions. <br /> • STM 2020-2:Article 6 - Authorize Special Legislation Development Surcharge for Community <br /> Housing(Citizen Petition) <br /> 12 <br />