Laserfiche WebLink
�������� _Streamlining Business Signage:Enhancements to the sign bylaw,aimed at simplifying signage <br /> processes for businesses,are detailed in ATM Article 47.These changes await final adjustments <br /> by the Planning Board and a positive vote at the Town Meeting,marking a significant step <br /> towards a business-friendly downtown. <br /> �������� _Tourist-Focused Social Media lnitiatives:In alignment with our goal to enhance downtown <br /> vibrancy,the Semiquincentennial Commission has partnered with a communications firm.This <br /> collaboration focuses on leveraging social media campaigns designed to attract tourists, <br /> especially during the 250th-anniversary celebrations,further enriching our downtown's appeal. <br /> These initiatives collectively represent our commitment to transforming Lexington's downtown into a <br /> more engaging,accessible,and vibrant community hub. <br /> Goal#4: Improve communication efficiency in Board meetings and with staff <br /> (primary:Joe Pato,assistant:Suzie Barry) <br /> � <br /> Update: <br /> ��������� Workin with staff to revise rocedures for re uestin an item on the Select Board a enda. �- Formatted:Font:Book Antiqua,��pt <br /> ,,,,,,,,,� g p q g <br /> g . .. <br /> �.......................................................................................................................................................................................................................................................................................................................................................................................................................................................................� <br /> Guidelines for submission materials include logistical information,requested action,as well Formatted:Bulleted+Level:1+Aligned at: 0.25"+ <br /> common areas of concern that Board Members will want to see addressed.Com letion ex ected Indent at: 0.5" <br /> p p w...................................................................................................................................................................................................................................................................................................................................................................................................................................................................... <br /> by end of Spring 2024. <br /> ��������� Exploring how to integrate the above procedures with new agenda management software that <br /> will replace the now obsolete Novus Agenda package. <br /> Goal#5: Transition to 100%renewable energy <br /> (primary:Mark Sandeen) <br /> Update: <br /> �.......................................................................................................................................................................................................................................................................................................................................................................................................................................................................� <br /> �������,,,,,,,,,,,,,,,,,,,,,,,,,,There are approximately 18 MW of solar energy systems currently installed in Lexington. �- Formatted:Bulleted+�evel:1+Aligned at: 0.25"+ <br /> � There were 3.6 MW of new solar energy systems added in Lexington during 2023. Indent at: 0.5" <br /> . . <br /> �������-� Approximately 55 million kWh of Lexingtori s commercial electricity usage is currently provided <br /> from 100%renewable energy sources. <br /> I �������-� The Town of Lexington has established the HeatSmart Advisor program to provide Lexington <br /> residents who express an interest in converting their HVAC systems to heat pumps with the <br /> I �,�����:r� and consultation to empower them to make the transition <br /> educational resources,.�. .: �;�................................................................�. <br /> with confidence.The program is now in its second year. <br /> I �������-,�,,,,,,,,,,,,,,,,There are currently 1,505 electric vehicles(6.2%)and 2,692 hybrid vehicles(11.3%)registered in <br /> Lexington versus 19,889 internal combustion vehicles(82.5%)according to the Massachusetts <br /> DOT vehicle census as of January 1,2024.There were 431 additional electric vehicles registered in <br /> Lexington in the last year.There were 358 additional hybrid vehicles registered in Lexington in <br /> the last year. <br /> I �������� The Massachusetts Department of Energy Resources approved Lexingtori s application to <br /> participate in the 10 Communities Demonstration Project with a start date of March 21,2024. <br /> �������� _The first year of Building Energy Use Disclosure Data has been published on the Town website.- <br /> https://www.lexin tog nma•�/1645/Buildin -�Energ9y-Use-Disclosure <br /> �������� Complete Net Zero Police Station-Construction is underway for the solar canopy structure, <br /> which is expected to be completed by the Fall of 2024. <br /> 6 <br />