119 120
<br />While the waste water runs into cesspools which require
<br />attention, consumers exercise some care in the use of water,
<br />but when the surplus gives them no trouble, it is allowed to
<br />run freely. Our sister town of Arlington, after much de-
<br />liberation in the matter, have finally joined the Metropolitan
<br />Water Supply system, and it may be the best solution of
<br />the matter for us to do the same.
<br />Before we can learn the cost of such an arrangement, it
<br />will be necessary for us to make an application by vote of
<br />the town for admission into the Metropolitan Water Supply
<br />system, then the commissioners will investigate the case and
<br />give us the cost, and whether anything will be allowed
<br />for any part of our system which may be used by them.
<br />In case the town deem the cost excessive they are not
<br />obliged to enter.
<br />We therefore advise that the town apply for conditions
<br />and cost of entering the Metropolitan Water Supply system.
<br />EXTENSION OF MAINS, ETC.
<br />Extension of water mains on Hancock St., Fern St.,
<br />Clark St., Massachusetts Ave. near Arlington, and Massa-
<br />chusetts Ave. on Concord Hill, have been made, and the cost
<br />will be found in the list herewith presented.
<br />MASSACHUSETTS AVE. AT VILLAGE HALL To NEW STAND -PIPE.
<br />1858 feet 6 in. pipe, including lead and packing, *557.40
<br />Fittings, 46.55
<br />Labor, 294.00
<br />8897.95
<br />Total cost per foot, 474 cts.
<br />FERN ST., OFF PLEASANT, EAST LEXINGTON.
<br />684 ft. 4 in. pipe,
<br />Fittings,
<br />Explosives,
<br />Labor,
<br />Total cost per foot, 541 cts.
<br />IIANCOCIi ST., FROM ADAMS ST., NORTH.
<br />2009 ft. 6 in. pipe, including lead and packing,
<br />2 hydrants,
<br />Fittings,
<br />Labor,
<br />Total cost per foot, 49+ cts.
<br />MASSACHUSETTS AVE., CONCORD HILL.
<br />1971 ft. 6 in. pipe, including lead and packing,
<br />Fittings,
<br />Labor,
<br />Total cost per foot, 534 cts.
<br />CLARK ST.
<br />115 ft. 4 in. pipe, including lead and packing,
<br />Fittings,
<br />Labor,
<br />Total cost per foot, 43 cts.
<br />$170.50
<br />1.85
<br />12.00
<br />195.00
<br />$379.35
<br />$602.70
<br />50.00
<br />13.35
<br />322.50
<br />*988.55
<br />*59.25
<br />3.35
<br />40.50
<br />$103.10
<br />$28.75
<br />2.00
<br />18.75
<br />*49.50