Laserfiche WebLink
TOWN OF LEXINGTON <br />Permanent Building Committee <br />Permanent Members <br />Chairman: Jon Himmel <br />Philip Coleman, Charles Favazzo, Howard Hobbs, Peter Johnson, Carl Oldenburg, <br />Project Specific Members <br />Diamond Middle School Hastings Elementary Fire Station <br />Margaret Coppe Curt Barrentine Robert Cunha <br />Edwin Goodell Andrew Clarke Joseph Sirkovich <br />Clarke Middle School <br />Howard Hobbs <br />Dick Perry <br />Visitors Center <br />Joel Berman <br />Peter Kelly <br />April 12, 2017 <br />Members Present: Philip Coleman, Charles Favazzo, Howard Hobbs, Carl Oldenburg, Dick Perry <br />Edwin Goodell, Robert Cunha, and Joseph Sirkovich <br />Members Absent: Peter Johnson <br />DPF Staff: Patrick Goddard, Director of Public Facilities, Mark Barrett and Ann Marie Ponzini <br />7:05 - The meeting was called to order. <br />Police Station Project (Joint Meeting with Historical District Committee, HDC) — Jeff McElravv <br />(Tecton Architects), Chief Mark Corr (Lexington Police) <br />Jeff presented the three Conceptual Design Options to HDC for staying at the current <br />Massachusetts (Mass.) Avenue location or relocating to the 173 Bedford Street location. Jeff <br />stressed that these are very conceptual designs. Key features are noted below: <br />Option 1 & Option 2- Mass. Ave. Location <br />There are many similarities in both options. A renovation project in the existing building <br />would trigger new building code requirements that could have a significant impact on the <br />scope and cost of the renovations work. Height of the ceiling for basement use is a concern. <br />Placing cell blocks in the basement requires at least a 10 foot ceiling height. The current <br />height is 8 ft. For locker use in the basement, it is recommended to have a higher floor to <br />ceiling height for ventilation. <br />• How best to preserve the amount of parking, possible moving of the Hosmer House, and <br />preservation of the green space area was discussed <br />• Sallyport and Prisoner areas would all be kept on one side of the building and a nine bay <br />indoor parking for cruisers, along with maintenance, would be out back. Option 2 reflects <br />a Sallyport with a drive through built on the side. <br />• The 2nd floor would house administration, investigation and an evidence room. <br />• Pro's and Con's for both Option 1 and 2 are similar as presented. #1 Probable Projects <br />Cost show $25,397,762 and #2 Probable Projects Cost show $23,843,542. <br />• The Mass Ave. allows Police Headquarters to keep its in -town relationship that they <br />currently have with local business and the public. <br />201 BEDFORD STREET • LEXINGTON, MASSACHUSETTS • 02420 <br />