|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2017-03-21-CONCOM-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Conservation Commission-ConCom
>
Minutes
>
2010-2019
>
2017
>
2017-03-21-CONCOM-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2019 1:14:36 PM
Creation date
5/2/2017 3:32:40 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - CONCOM - Conservation Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Mullins explained that the applicant is requesting a one year extension for their permit. They <br />have already received a one year extension. Some work has begun, but the project is not <br />complete. <br />Motion to extend the Order of Conditions for one year made by Mr. Langseth and seconded by <br />Mr. Beuttell. Vote: 5-0 in favor. <br />7:06pm <br />Motion to approve minutes of 1/31/2017 made by Mr. Langseth and seconded by Mrs. Dohan. <br />Vote: 5-0 in favor. <br />Motion to approve minutes of 3/6/2017 made by Mr. Langseth and seconded by Mrs. Dohan. <br />Vote: 5-0 in favor. <br />7:07pm <br />NEW MEETINGS/HEARINGS <br />DET 16-8 <br />RDA, 90 Grant Street <br />Owner/applicant: J and N Design and Build <br />Project: Request to amend approve drainage plan <br />Motion to continue the hearing to 4/4/2017 at the applicant’s request made by Mr. Langseth and <br />seconded by Mrs. Dohan. Vote: 5-0 in favor. <br />7:08pm <br />DEP 201-XXXX, BL XXXX <br />NOI, 758 Marrett Road <br />Owner/Applicant: Minuteman Vocational Regional and Technical High School <br />Project: Raze and rebuild of existing school building and associated site work <br />Stephen Garvin, Samiotes Consultants <br />This site straddles the Town of Line of Lexington and Lincoln. Mr. Garvin explained that in <br />2014, the Conservation Commission issued an ORAD for the site. They are designing this <br />project around the wetlands confirmed in that ORAD. In Lexington, the scope of this project is <br />the reworking of the entrance road, the demolition of the existing school building, and the <br />creation of athletic fields. The new school will be built in Lincoln. <br />In terms of phasing, the first step would be to construct the new school in Lincoln which will be <br />completed in the fall of 2019. Following the completion of the new school, the existing school <br />would be demolished, and then the fields would be constructed. The existing drain lines will be <br />extended to the new school. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.