|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2017-04-13-CPC-ATM-rpt (Update #2)
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
ELECTIONS AND TOWN MEETING ACTION & WARRANTS
>
Town Meeting Minutes and Reports
>
2010-2019
>
2017
>
Reports
>
2017-04-13-CPC-ATM-rpt (Update #2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 4:21:58 PM
Creation date
4/24/2017 11:27:24 AM
Metadata
Fields
Template:
Archives
Year
2017
Author or Source
Community Preservation Committee
Department
Town Clerk
Keywords or Subject
Town Meeting Community Preservation Committee UPDATE #2 TO THE Report to 2017 Annual Town Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Goals and Objectives: <br /> • Replace existing filtration systems which are beyond their life expectancy; <br /> • Enlarge the building which houses the filtration system in order to accommodate the new <br /> systems; and <br /> • Implement the above-mentioned upgrades in order to ensure the successful operation of <br /> the Town Pool complex. <br /> Project Benefit: <br /> The Town Pool Renovation project will ensure the complex's continued successful operation by <br /> addressing priority needs and reducing impacts to the operating budget due to continued repairs. <br /> This FY18 CPA request will fund the implementation of a new filtration system and additional <br /> upgrades to the facility. <br /> Funding Request: <br /> The original FY18 CPA request was $1,620,000. Despite the 2016 mini-audit,project bids came <br /> back higher than expected and the Recreation Committee subsequently requested $2,154,350 in <br /> order to complete the project within the initial scope and the original timeline. The new total <br /> reflects the project cost based on bids received($1,958,500) and a 10% contingency ($195,850). <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.