Laserfiche WebLink
Community Preservation Committee <br /> Annual Town Meeting 2017 <br /> Updates: <br /> This document reflects changes that have come to the CPC's attention since the date of <br /> publication of the Community Preservation Committee Report to 2017 Annual Town Meeting. <br /> The Community Preservation Committee has recommended Indefinite Postponement of the <br /> Stone Building Feasibility Study (Article 10(h)). <br /> Due to the Indefinite Postponement of this article, several descriptions and tables in the original <br /> report have been updated to reflect the adjusted amounts. <br /> The following pages of the CPC Report to 2017 Annual Town Meeting(approved March 27, <br /> 2017) have been replaced and are included in their entirety in this publication: <br /> • Page 1-Summary of Recommended CPA Projects under Article 10 for Annual Town <br /> Meeting. <br /> • Page 17-Article 10(h),Stone Building Feasibility Study-Project Summary. <br /> • Page 52-FY18 CPA Project Costs and Summary. <br /> • Page 53-Summary of net balance available after 2017 Annual Town Meeting. <br /> 1 <br />