|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2017-03-27-CPC-ATM-rpt
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
ELECTIONS AND TOWN MEETING ACTION & WARRANTS
>
Town Meeting Minutes and Reports
>
2010-2019
>
2017
>
Reports
>
2017-03-27-CPC-ATM-rpt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 4:21:50 PM
Creation date
3/30/2017 9:05:01 AM
Metadata
Fields
Template:
Archives
Year
2017
Author or Source
Community Preservation Committee
Department
Town Clerk
Keywords or Subject
Town Meeting Community Preservation Committee Report to 2017 Annual Town Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 10 (1) <br /> Project: Park Improvements-Athletic Fields <br /> CPA Category: Recreational Resources <br /> Amount Requested: $125,000 <br /> Amount Recommended: $125,000 <br /> CPC Vote: (9-0) <br /> Project Description: <br /> This is an ongoing, multi-year capital program designed to preserve and rehabilitate Town <br /> athletic fields, address safety and playability concerns and provide safe, adequate field conditions <br /> for neighborhood families, recreation groups and school programs. This FY18 request seeks to <br /> fund improvements to the current irrigation systems. The Town has met with a consulting <br /> company in order to conduct an irrigation audit and seeks to make changes to the current systems <br /> for more efficient water usage and repairs. The updated irrigation system would be a web-based <br /> system focused on efficiency and water conservation and allow irrigation to be more targeted on <br /> the playing areas. <br /> This funding request would cover the cost of implementing the technology at 14 athletic fields. <br /> Implementation would include the purchase and installation of valves,plumbing, controllers and <br /> all installation costs at each site. <br /> Project Goals and Objectives: <br /> • Implement a web-based irrigation system at 14 athletic fields; and <br /> • Increase efficiency while decreasing water consumption. <br /> Project Benefit: <br /> Updates to the existing systems will allow irrigation to be targeted on the playing areas and result <br /> in less water usage. Timely renovations and replacement are critical to providing safe and <br /> playable fields for all user groups. <br /> Funding Request: <br /> The FY18 CPA request is $125,000. <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.