Laserfiche WebLink
<br />MWRA suggests they break construction into 2 phases <br />Maple Street ramp and start with pipe construction <br />They need truck access from Bow St to Foller St. There will be dump trucks full of soil on the <br />bikeway, full of gravel and front-end loaders <br />Ellen Dana Court is a private road and we would have to get approval to use that road and <br />make improvements to widen it and improve it – get approval for use and temporary easement. <br /> <br />Betty asked who in town they reached out to and how did they determine there wasn't <br />support. Their response what engineering and traffic in town. They also think that having <br />emergency vehicles only respond in one way and the other having to do the detour isn't a good <br />idea. <br /> <br /> <br />Alternative 2: <br />Safety for a protected, contra flow bike lane <br />What if we detoured traffic off Mass Ave