Laserfiche WebLink
3/10/2016 AC Minutes <br />• A motion was made and seconded to support this project. The motion passed. <br />VOTE: 9 -0 <br />(i) Minuteman Bikeway Wayfinding Signs Implementation: Last year, $39,000 was <br />appropriated for design work; the current request for $120,000 is for purchasing and <br />installing 220 signs. It is expected that $200 will be needed annually for maintenance. <br />• A motion was made and seconded to support this project. The motion passed. <br />VOTE: 9 -0 <br />0) Town Pool Renovation Design and Engineering Costs: This is an ongoing project. <br />• A motion was made and seconded to support this project. The motion passed. <br />VOTE: 9 -0 <br />(k) Park Improvements Athletic Fields: This includes rehabilitation of basketball <br />courts. <br />• A motion was made and seconded to support this project. The motion passed. <br />VOTE: 9 -0 <br />(1) Granite Forest Pocket Park Construction at Lincoln Park: This project includes plans <br />to use granite pillars found on the Inn at Hastings Park site. The plan is to create a <br />gathering and sitting area with public art near the Lincoln Street fields. Because no <br />design was available, this Committee deferred taking a position. <br />(m) Park Improvements Athletic Fields: The project is for improvements of the fields <br />behind the Waldorf School, including laser - grading, improved drainage and benches. <br />• A motion was made and seconded to support this project. The motion passed. <br />VOTE: 9 -0 <br />(n) Park and Playground Improvements: Fences and posts need to be repaired or <br />replaced because of frost heaves. <br />• A motion was made and seconded to support this project. The motion passed. <br />VOTE: 9 -0 <br />(o) Grain Mill Alley Design Implementation: The project now includes development of <br />two sites, one near the bikeway and the other at Massachusetts Avenue, to attract and <br />guide bikeway users into the Town center. No private property is involved. There is <br />approximately $5,000 left from a previous appropriation of $18,000 for design <br />development and a pilot project. <br />• A motion was made and seconded to support this project. The motion passed. <br />VOTE: 9 -0 <br />(p) CPA Debt Service <br />• A motion was made and seconded to support this project. The motion passed. <br />VOTE: 9 -0 <br />(q) Administrative Budget <br />• A motion was made and seconded to support this project. The motion passed. <br />VOTE: 9 -0 <br />4 <br />