Laserfiche WebLink
Greenways Corridor Committee <br />November 28, 2016 <br />Ellen Stone Room, Cary Hall <br />Lexington, Massachusetts <br />Members Present: Alex Dohan, Peggy Enders, Eileen Entin, Don Grant, Bob Hausslein, Susan <br />Kenyon, Keith Ohmart, Mike Tabaczynski <br />Other Attendees: Mal Crawford, incoming Committee member <br />Votes: Minutes from 10/24/2016 meeting: Approved <br />Reports /Updates: <br />• Welcome to Mal Crawford, who will be joining GCC as soon as the Board of Selectmen for- <br />mally approve his appointment. <br />• Keith and Mike recently met with Carol Kowalski, the Assistant Town Manager for Develop- <br />ment. There were several points of conversation, including: the Pelham Road school build- <br />ing; the Lexington Montessori School easement on DOT property; the Garfield St private way <br />issue; maintenance of Open Space that is not Conservation property such as the Laconia St <br />parcel, the path from Bridge School to Coppersmyth Way, and the Shire easement. Mike has <br />made a mock -up of a proposed Town of Lexington Property sign that could be used for am- <br />biguous locations. Another meeting is scheduled for December 15. <br />• A new Superintendent has not yet been appointed for the Minute Man National Historical <br />Park. It would be good if the GCC could arrange a meeting as soon as possible once a new <br />Superintendent is on board to request permission for continuing Route F through the Park. <br />Richard Canale will be monitoring the situation on behalf of GCC. <br />• The Shire trail is done! A few more signs need to be installed, but the trail is ready for use. <br />Ongoing Business: <br />• Route H - discussion of the trail segment between Coppersmyth Way and the Bridge School <br />playing fields. General agreement was made that the walk as "tested" a couple of weeks ago <br />was satisfactory to all. Brief discussion of ldylwilde path, will be presented to Conservation <br />Commission on Monday. Need to be in communication with DPW regarding clearing along a <br />portion of Lincoln St, and perhaps get the Lincoln St Neighborhood group involved. <br />• Mike has an ARC GIS map all set for Route H. Posts and signs will go up in the spring. <br />• The Weston St intersection with Lincoln Street would benefit from the installation of a cross- <br />walk and additional caution signs. This will be discussed when we meet on site with DPW. <br />• Brochure - The budget for design, layout, and printing is $3000.00. The Community Fund for <br />Lexington wants new projects, so GCC maps don't qualify, since we are an ongoing activity. <br />Lots of maps are needed for different activities (Tourism, Bikeway, etc.). Keith will add a dis- <br />cussion item to the next meeting with Carol Kowalski to strategize on how this might be in- <br />cluded in the FY2018 budgeting cycle. <br />• Without new maps, we need to try to get online map updated sooner rather than later. <br />• Alternative route signage, such as maps mounted on posts, would be expensive. <br />• Susan and Peggy met with Maria Tintocalis about the kiosk planning and will continue to <br />monitor the design process. <br />