Laserfiche WebLink
Lexington Permanent Building Committee Meeting <br />Maria Hastings Elementary School Building Project <br />SBC MEETING MINUTES <br />DATE OF MEETING: December 22, 2016 at 7:OOP.M. at 201 Bedford St, Lexington MA <br />PROJECT: Maria Hastings Elementary School Building Project <br />Dore & Whittier Project #MP16 -0112 <br />SUBJECT: School Building Committee Meeting (D &W #5) <br />ATTENDING: <br />Jon Himmel <br />Andrew Clarke <br />Curt Barrentine <br />Richard Perry <br />Charles Favazzo <br />Philip Coleman <br />Peter Johnson <br />Carl Oldenburg <br />Louise Lipsitz <br />Pat Goddard <br />Mark Barrett <br />Judy Crocker <br />Trip Elmore <br />Rachel Milaschewski <br />Donna DiNisco <br />Ken DiNisco <br />Lexington PBC Chair <br />Lexington PBC <br />Lexington PBC <br />Lexington PBC <br />Lexington PBC <br />Lexington PBC <br />Lexington PBC <br />Lexington PBC <br />School Principal <br />Lexington DPF <br />Lexington DPF <br />School Committee Liaison <br />DWMP <br />DWMP <br />DiNisco Design <br />DiNisco Design <br />1. Approval of November 10, 2016 and December 8, 2016 PBC /SBC Meeting Minutes — PBC <br />Motion to approve and certify the November 10, 2016 meeting minutes as <br />the official record for the MSBA and December 8, 2016 PISBC Meeting <br />Minutes by C. Oldenbug, ,2nd by D. Perry. <br />Minor typo corrections were cited on 11/10/16 — Page 2, #5 2nd line "out should be our" <br />And 12/8/16 — 2.b.3 "Barrantine should be Barrentine" <br />VOTE: Unanimous to approve <br />2. Presentation of Options and Preliminary Cost Estimates <br />D. DiNisco ran through their presentation (see attached) reviewing each option and concept of each <br />option from a base repair, an add /reno option, and a new building. She reported the current cost <br />estimates which were recently received by PM &C and AM Fogarty, stating that the estimated cost of <br />the add /reno came in at $59,300,000 (does not include cost of needed swing space), and the <br />estimated cost of the new building came in at $61,700,000. <br />A NIA; E iM'E E N 1 <br />A.R"1'NE'E2 ., 1 <br />PROJECT MANAGERS <br />ARCHITECTS <br />ITECT'S <br />Ne8J11.1uui'49rano`r„ MA 01950 <br />260 hdrrriorm6 HtrQ =cw Bldg 7 <br />978.499'1999 h.. <br />9"78, 499.7C44'flax <br />ncflwlt ttit^r° „cc <br />