Laserfiche WebLink
Minutes of the Lexington Capital Expenditures Committee (CEC) Meeting <br />November 15, 2016 <br />Rite (Masons) and to which that owner would not agree. The new design is not brick <br />and does not include lighting. The Committee requests: <br /> Additional Information on the new design. <br /> Information as to whether the current users or management of that Center <br />have expressed any demand for the sidewalk. <br /> #1002 Staging for Special Events: This purchase would eliminate the need to borrow <br />staging from the Town of Waltham. <br /> #1040 Westview Cemetery Irrigation: This project would complete the installation of <br />irrigation at Westview. <br /> #1043 Highway Sign Machine: The current sign-making system is 15 years old and <br />has reached its end of life. The new machine is expected to eliminate, or at least <br />significantly reduce, the need to hire outside contractors to make signs. The <br />Committee requests: <br /> A cost/benefit analysis including how this machine would impact staffing. <br /> #321 Center Streetscape Improvements: The Center Streetscape Design Review Ad <br />hoc Committee has been preparing reports on three tiers of the work being <br />contemplated for Lexington Center. Tier 1 report, recommending sidewalk materials <br />and lighting, was presented to the BoS, received a review by DPW, and is being <br />revised in response to questions and concerns. Reports on Tier 2 (edging; roadway <br />features; stone walls; posts, bollards and interpretive markers; structural soil, and <br />infiltration basis) and Tier 3 (amenities \[tables and chairs\]; thin planters, interpretive <br />elements, and trees) are anticipated by the end of this year. The dollars requested <br />for this project are a placeholder; the range of options for a final design results in <br />what are likely to be significantly varying dollar needs. The BoS is scheduled to <br />receive additional traffic-study results for the Woburn Street-Massachusetts Avenue <br />intersection element of this project on next Monday evening identifying mitigation for <br />potential cut-through traffic on Winthrop Road if a signal were installed at that <br />intersection. That intersection element of the project can be implemented <br />independently of the other project elements. This Committee had serious doubt <br />whether, considering the continued uncertainties, even that intersection element in <br />the project could be ready for the 2017 ATM. <br />Continued Discussion of the Committee’s Organization and Processes for the <br />FY2018 Budget-Review Cycle: <br />A Motion was made and seconded to approve the ÐDraft <br />Lexington CEC Subject Areas & Liaison Assignments for Fiscal Year 2017, dated <br />Vote: 4–0 <br />31 Oct 2016Ñ. <br />Adjourn: <br />Vote: 4–0 <br /> A Motion was made and seconded at 9:34 .. to adjourn. <br />AM <br /> <br /> <br />These Minutes were approved by the CEC at its meeting November 29, 2016. <br /> <br />Page 6 of 6 <br />