|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2016-09-26-GCC-min
Breadcrumb Navigation:
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Greenways Corridor Committee-GCC
>
Minutes
>
2011-2019
>
2016
>
2016-09-26-GCC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2019 6:18:30 PM
Creation date
12/6/2016 1:02:45 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - GCC - Greenways Corridor Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Greenways Corridor Committee <br />September 26, 2016 <br />Parker Room, Town Office Building <br />Lexington, Massachusetts <br />Members Present: Peggy Enders, Eileen Entin, Don Grant, Bob Hausslein, Susan Kenyon, <br />Keith Ohmart, Mike Tabaczynski <br />Votes <br />: Minutes 6/16/2016: Approved <br />Reports/Updates <br />: <br />• Brochure Distribution: Susan reported that 4 student volunteers distributed brochures over <br />the summer. As of this date about 12,000 brochures (of the 15,000 that were printed) have <br />been distributed. Susan has 4 volunteers to distribute brochures this fall. At this point she has <br />met with two of them. <br />• Grove St.: The builder has submitted plans to the planning board. There are no plans for the <br />Town to purchase the property. No new action on the committee’s part is required at present. <br />• MA DOT Right of Way/Montessori School Conservation Restriction: The request for a right of <br />way is moving forward slowly. Carol Kowalski, on behalf of the Town, will submit a formal re- <br />quest to the DOT to use the access road. Mike and Keith will continue to follow this. <br />• DCR Lot 1 Trail Development: Keith and Mike are working with the Brookhaven Nature Com- <br />mittee on an application to DCR to put in a trail. The Conservation Commission will provide a <br />letter of support. <br />• Route G Installation: During the inaugural walk on Route G on Sept 25, we determined that a <br />few additional directional signs would be advisable. Bob will take care of these. Mike will ad- <br />just the Route G map to concur with the signed path through Lower Vine Brook. <br />• Shire Trail Update: Final construction will occur on Oct 7 with the help of a corporate group <br />from Shire. This trail could be linked to the new development on Lincoln St. abutting the Cam- <br />bridge Watershed property and Cranberry Hill. The committee will discuss the possibility of a <br />new route in this area at a future meeting. <br />• Route B around Clarke Middle School: Eileen reported that because of the construction go- <br />ing on at Clarke, we need to provide a different way to get from Brookside to the entrance to <br />Dunback Meadows. Bob and Eileen will look at the options and install temporary signs. Keith <br />will check the A route at Diamond, which is also undergoing significant construction, to see if <br />any temporary route modifications are required. <br />Ongoing <br />: <br />• Route F extension/Minuteman National Park trail signs. Keith will contact John Livsey to set <br />up a meeting to discuss possible ways to get across Rte 2A in light of any possible Town plans <br />for improvements around Old Mass Ave/Rte 2A. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.