Laserfiche WebLink
<br />Minutes of the January 4, 2024 Meeting of the Greenways Corridor Committee <br /> <br />Members present in person: Keith Ohmart (chair), Alex Dohan, Eileen Entin, Yifang <br />Gong, Bob Hausslein, Bobak Moshiri, Stephen Perkins <br />Members present virtually: Mal Crawford, <br />Non-members present in person: Mike Tabaczynski <br />Non-members present virtually: Susan Kenyon <br /> <br />The minutes of the Nov 6, 2023 meeting were approved unanimously. <br /> <br />Reports/Updates <br /> <br />Keith, Yifang and Eileen met with Jessi Chen recently. Jessie is a Board Member of <br />CAAL. She has offered to promote ACROSS Lexington via a blog that she manages for <br />the CAAL community. This will involve creating an on-line interview with Keith. <br /> <br />Proposed Route 8 – Concord Ave project – The Judy Record Fund has approved a <br />grant funding the land management portion of this project. Funding is still needed by <br />Conservation to cover the cost of boundary surveying. Susan mentioned that the Rick <br />Abram’s Fund may also be able provide funds if needed, subject to approval by the <br />Trustees. <br /> <br />Proposed Route 9/Concord Ave./Waltham St. Bob reported that a site visit with Dave <br />Pinsonneault failed to materialize and we have missed the window to install the posts <br />for the season. This will be revisited in the spring with approval anticipated. <br /> <br />Proposed Route 19/AGM/LVB Connector. A meeting has been arranged with Karen <br />Mullins for next Monday to approve creation of a new route through the wooded parcel <br />behind Harrington School. She is going to arrange for the Exec director of Lex Housing <br />Authority also to meet up on Monday. <br /> <br />Proposed Waterstone Connector. Route 19. Mike, Stephen, and Keith met via Zoom <br />with Karen and Carol Kowalski earlier this fall. Carol subsequently provided <br />introductions to the appropriate people at MassDOT and MWRA, with the expectation <br />that much can be carried forward without her involvement. Karen provided wetland <br />surveys of the area near Waterstone. Mike provided the new map. Keith will reach out <br />to MWRA first and once received the approval, will reach out to Mass DOT. We have <br />the Town support so this looks good. $35K was secured when the Waterstone project <br />was approved by the town for trail connections and that should cover most of the costs <br />of surveying wetlands. <br /> <br />Proposed Route 4/Wright Farm/Simonds Brook/Paint Mine: <br />The new proposed trail connection to the end of Rangeway will need to wait for <br />Conservation that have earmarked it for FY2026 for permitting and approval. <br /> <br />Memorial Bench Proposal: <br /> <br />