|
Lexington Home Page
|
Help
|
About
|
Browse
Search
Planning Board minutes 1989-04-10
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Planning Board-PB
>
Minutes
>
1980-1989
>
1989
>
Planning Board minutes 1989-04-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2024 4:21:19 PM
Creation date
1/24/2024 4:21:19 PM
Metadata
Fields
Template:
Archives
Year
1989
Department
Planning
Keywords or Subject
Planning Board minutes 1989-04-10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minutes for the meeting of April 10, 1989 2 <br /> ****************************** REPORTS ************************************** <br /> 111. Planning Director <br /> a. Marrett Road CD - Sheraton Update: Traffic engineer, Richard Cook, <br /> reported BSC has done an analysis of the traffic study submitted by Vanasse <br /> Hangen with the proposal and that basically they are in agreement with the <br /> conclusions reached by Vanasse Hangen. He noted the right turn in - right <br /> turn out proposal will improve the flow of traffic in the area. He said the <br /> additional traffic being brought through the Mass. Avenue - Marrett Road <br /> intersection should be able to be accommodated with a minor change in the <br /> width of Mass. Ave. on its approach to Marrett Road. His recommendation is <br /> that the roadway be widened on the right hand side as you approach the <br /> intersection and that two lanes be established there. That and a police <br /> officer during peak periods, should improve traffic operations there. BSC's <br /> recommendation is that the Town, or the applicant for the CD rezoning, provide <br /> the necessary corrective measures until the Marrett Road improvements are <br /> completed. <br /> Mr. Cook added that BSC is preparing to go into the next design stage as soon <br /> as the overhead utility issue at the Minute Man National Park entrance can be <br /> 1 resolved. He estimated that resolution of this problem should allow the de- <br /> 1 sign work to be completed in 1989, possibly meeting the State schedule for <br /> bidding the job in the spring of 1990, with construction to begin in the sum- <br /> mer of 1990. He noted the State appears to want to move on this project as <br /> quickly as possible, and have been urging the Town and the consultant to get <br /> moving on this. <br /> Mr. Bowyer reported that Flatley Company has offered to impose the condition <br /> on themselves that a certificate of occupancy not be issued for the addition <br /> and remodeling until the contract is awarded or construction started for the <br /> Marrett Road improvements. <br /> The meeting was adjourned at 7: 52 p.m. <br /> Eleanor Klauminzer, Clerk ' <br /> J <br />
The URL can be used to link to this page
Your browser does not support the video tag.