|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2016-09-01-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2016
>
2016-09-01-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:58:14 PM
Creation date
11/3/2016 3:15:45 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TOWN OF LEXINGTON <br />Permanent Building Committee <br />For the <br />Clarke & Diamond Middle School Project, Lexington, MA <br />Location: 201 Bedford Street, Meeting Room 221 <br />Date: September 1, 2016 at 7:00 p.m. <br />Members Present: Phil Coleman, Carl Oldenburg, Margaret Coppe, Howard Hobbs, Lee Noel Chase <br />Members Absent: Eric Brown, Chuck Favazzo, Jon Himmel, Peter Johnson, Dick Perry, Edwin Goodell <br />Guests: Ken DiNisco & Angel Khazadian (DiNisco Designs), Mike Lambert & Greg Williamson (Bond) <br />and Paul Kalous (Hill), Judy Crocker (SC liaison) <br />Staff: Patrick Goddard, Director of Public Facilities and Ann Marie Ponzini <br />At 7:08, a quorum was still not present. Phil Coleman was the acting Chair for the evening. A verbal update <br />and discussion of topics was started as agreed upon by those present. <br />DPF stated that the focus of tonight's meeting is to review a rough draft of the GMP and to get approval of <br />the filed sub -bids. <br />1. General Project Update — Hill <br />Paul handed out a Project Update Agenda that covered the Summer Space Mining Work and Early Site Work <br />for Clarke and Diamond Middle Schools. A Trade Bids Worksheet was also handed out. <br />• Handout showed pictures of the work that has been completed and stated spaces are now occupied. <br />• Showerheads still need to be installed at both schools. One head has been installed at Clarke, and <br />personnel at Diamond are fine with waiting for all the heads to come in. <br />• A punch list was completed last week. Expecting to finish work as quickly as possible this weekend <br />and through next week. <br />• It was stated that personnel overall seem happy with the completed work. <br />• PBC asked if the subs performed as expected. Were extra dollars spent to get the summer slammer <br />portion of this project completed? <br />o Hill stated that overtime has been used to get this done, as well as added cost for transite pipe <br />removal, a possible $80,000 (work at both Clark & Diamond), however; slips have not been <br />fully reviewed as of yet. <br />At 7:20 a quorum was in place and Phil called the meeting to order. <br />2. Discussion of the Trade Bids - Hill <br />Hill reviewed the filed sub bid amounts which showed low open bids $3,241,235 less than what was <br />estimated. <br />PBC Meeting 09.01.16 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.