Laserfiche WebLink
Project: Retaining Wall repairs <br />Catherine Chan- Homeowner <br />Documents: RDA Package 5/24/2016 <br />Ms. Chan explained that she bought the house over the winter and the retaining walls and patio <br />need some repairs. The two retaining walls are in the backyard and the patio in the back is <br />starting to sink in. <br />Questions and comments from the commission: <br />The commission requested the erosion controls be put in place around the limit of work near the <br />patio. <br />Motion to issue a Negative Determination with conditions made by Mr. Beuttell and seconded by <br />Mrs. Miller. Vote: 5-0 in favor. <br />7:05pm <br />DET 16-23 <br />RDA, 211 East Emerson <br />Owner/Applicant: Catherine Yan and Jean-Baptiste Telliez <br />Project: Second Story addition <br />Catherine Yan- Homeowner <br />Documents: RDA package 5/24/2016, Proposed plot plan 5/24/2016, Presentation 6/13/2016 <br />Ms. Yan explained that she wishes to put a second story addition on their home. She explained <br />that the foot print of the house will remain the same. The wetlands were delineated and the home <br />addition will not extend beyond the existing house. Stockpiling will be done in the front and side <br />of the house, away from the wetland. She also stated that they would add a limit of work line on <br />the plan. <br />Questions and comments from the commission: <br />The Commission requested that guidelines be provided for how to clean out a culvert on the <br />property. <br />The commission stated that it looked like some leaves and yard clippings were dumped into the <br />wetland. Ms. Yan stated that they have hired a new landscape company that does not dump <br />clippings. <br />The commission requested that the 25 ft. buffer be returned to natural cover and no longer be <br />maintained as lawn. The applicant agreed to this request. <br /> <br />