Minutes of the Lexington Capital Expenditures Committee (CEC) Meeting <br />August 30, 2016 <br /> During reconstruction of the fire headquarters, an ambulance and pumper <br />would remain at the East Lexington Fire Station 24/7; currently those vehicles <br />are only there during the day. <br /> The trailers currently used at the Fire Headquarters for staff facilities would <br />not be needed at 171/173. <br /> 171/173 does not have a training hydrant. <br /> The large emergency generator at Fire Headquarters may be able to be <br />moved to 171/173 which does not currently have an emergency generator. <br /> Regarding potential abutter concerns, there is no need to use sirens during <br />normal sleeping hours; additionally, a significant number of the 10Î12 <br />emergency runs per day that leave the Fire Headquarters already travel on <br />Bedford Street, but there will be some increase in fire apparatus traffic for <br />some neighborhoods. <br />Ms. Hai noted that the financial modeling that had been done in the past for the <br />myriad capital projects that are being pursued had included rebuilding the fire station <br />headquarters, but had not included acquisition of land for swing space. The funding <br />source has been identified as debt, but timing has not yet been determined. A bond <br />anticipation note (BAN) would most likely be used to cover short-term financing until <br />a debt-exclusion referendum authorizes a long-term funding process. <br />Ms. Barnett asked whether use of the Public Services Building for swing space had <br />been studied and what could be expected for maintenance/utility costs for the swing <br />space once the new fire headquarters is completed. Mr. Addelson replied that the <br />Public Services Building was not studied for swing space, but that the facility is <br />currently in full use. Ms. Hai agreed to explore questions about the cost of the swing <br />space once it is vacated, but it was noted that it may be used for other swing-space <br />needs. <br />There was a 3-1 initial vote in support of Article 2 with the understanding that the <br />Chair and Vice-Chair can make non-substantive changes. Ms. Barnett was not <br />prepared to support it until a formal space study looks at using the Public Services <br />Building for swing space for the fire headquarters. <br /> Article 3: Supplemental Appropriation for Middle SchoolsÏAdditions and <br />Remodeling: This Article is a placeholder, dependent on the General Contractor bid <br />that is to be submitted in early September for renovations at Diamond and Clarke <br />Middle Schools. Sub-contractor bids indicate that those bids could be as much as <br />$3.0 million less than the amount budgeted for them. It is likely that this Article will <br />be indefinitely postponed. <br /> Article 4: Supplemental Appropriation for School Facilities Capital Projects: This <br />Article is to supplement previously appropriated funds for renovations and installing <br />modular units for the elementary schools. An initial solicitation for bids, which called <br />for delivery before the start of this fallÓs School Year, produced no bids. A second <br />solicitation was issued with a delivery date next spring, a base scope of five modular <br />th <br />units, and an add alternate for a 6 modular unit, and two bids were received. The <br />selected bid has a price that is about $1.4 million more than previously appropriated <br />for the project if six modular units are to be installed. Installing five units reduces the <br />additional amount required to about $860,000. Mr. Addelson said that he is <br />comfortable that $520,000 in unused funds from the previous appropriationÏ <br />Page 2 of 4 <br /> <br />