Laserfiche WebLink
SEPTEMBER 14, 2016 <br />SPECIAL TOWN MEETING 2016 -5 APPROPRIATION COMMITTEE <br />The present site of the Headquarters Fire Station is much too small to allow continued operations in tem- <br />porary facilities at that site while the existing facility is demolished and rebuilt, therefore acquisition of <br />swing space is critical. <br />Purchase of Property at 171 -173 Bedford Street <br />The property at 171 -173 Bedford Street is 2.77 acres in area. A two -story office building stands on the <br />property at the front of the property on Bedford Street. The rear of the property has a large paved parking <br />lot. The office building would be modified to serve the Fire Department's administrative needs, to pro- <br />vide accommodations for fire fighters on duty, and for equipment storage and maintenance. Temporary <br />structures or tents would be set up behind the building to provide heated garaging for fire truck, ambu- <br />lance, and possibly other vehicles. For the duration of the site's use as a temporary fire station, an on- <br />demand traffic signal would be installed on Bedford Street at the facility driveway, similar to the signal in <br />front of the current fire station. <br />The Town and property owners have signed a Letter of Intent regarding sale and purchase of the property; <br />the agreed -upon price for the real estate is $4,300,000. The sale is contingent upon approval at this Spe- <br />cial Town Meeting. The current owner listed the property and received offers from other prospective pur- <br />chasers before the Town made its final offer. The agreed -upon price is thereby derived directly from the <br />marketplace, and is presumed to be reasonable. <br />It should be noted that if the Town acquires the property, it could re -sell the property at some later date <br />and recoup much or all of the original cost. In other words, the land and building would not only serve an <br />immediate need of the Town, but would also constitute an investment asset with significant value and the <br />potential for appreciation. <br />We understand that no zoning changes are needed to locate the temporary fire station on the site. <br />Article 5 at this Special Town Meeting will request funds to conduct feasibility studies for a new police <br />station. The replacement of the police station will likely follow the replacement of the fire station by a <br />year or so. The Board of Selectmen has indicated that 171 -173 Bedford Street could serve as swing space <br />during construction of a new police station or, alternatively, it could be the site of the new police station. <br />These uses for the site would take priority after its use as temporary fire station ends. <br />Long -Term Schedule and Coordination <br />A schedule has been discussed for the reconstruction of the fire headquarters, but no board or committee <br />has yet voted on the details of specific actions or dates. We offer a sketch of a schedule here as contextual <br />information for Town Meeting. Note that, in order to coordinate a major debt exclusion referendum, the <br />timing of these requests will be strongly affected by the Massachusetts School Building Authority <br />(MSBA) review and approval of the design for the new Hastings Elementary. <br />Fall 2016 STM (now) <br />Acquire 171 -173 Bedford Street and Initiate Plan for Temporary Fire Station <br />Spring 2017 ATM /STM <br />Funding for Design and Construction Documents for Temporary Fire Station <br />Funding for Schematic and Design Documents for New Fire Station <br />Early Fall 2017 <br />MSBA vote on Hastings Elementary <br />Fall 2017 STM <br />Funding for Construction of Temporary Fire Station <br />Funding for Construction Documents and Construction of New Fire Station <br />Funding for Construction of Hastings Elementary <br />Late Fall /Winter 2017 <br />Debt Exclusion Referendum <br />Winter 2017 <br />Construct Temporary Fire Station <br />Spring 2018 <br />Move to Temporary Fire Station, Begin Construction on New Fire Station <br />A narrative for this schedule follows below. <br />5 <br />