Laserfiche WebLink
CAPITAL EXPENDITURES COMMITTEE REPORT TO SEPTEMBER 21, 2016, STM 2016 -5 <br />Section 21C; or by any combination of these methods; determine if the Town will authorize the Selectmen to <br />apply for, accept, expend and borrow in anticipation of state aid for such capital improvements; or act in any <br />other manner in relation thereto." <br />"DESCRIPTION: Bids for the Elementary Schools modulars are due in August. This Article is <br />requested as a precaution in case bids exceed the amounts appropriated under Article 2 of the <br />November 2, 2015 Special Town Meeting." <br />[Town Warrant] <br />That November 2, 2015 STM #1 total appropriation of $5,386,000 provided funding related to projects at <br />the Diamond & Clarke Middle Schools, the new Hastings Elementary School, and six modular <br />classrooms (modulars) to be purchased and installed at the Bowman, Bridge, and Fiske Elementary <br />Schools. (The plan was, and remains, for 2 modulars at each of those schools.) <br />The appropriation did not formally constrain a specific dollar value to any one of the covered efforts (i.e., <br />use of the total appropriation is fungible among efforts within the Motion's broad language). When <br />building the total appropriation, one component was $2,915,000 for the purchase and installation of six <br />modulars and another was $520,000 needed for Schematic Design of the new Hastings if that project were <br />not accepted by the Massachusetts School Building Authority (MSBA) for its support. (See this <br />Committee's report to that STM.) Also, $85,000 had previously been applied toward the modulars under <br />Article 2 of the March 23, 2015, STM #1. <br />Therefore, subject to reallocation of the use of that STM #1 appropriation, the total, prior, appropriated <br />allocation for the modulars project was $3,000,000. However, as MSBA did accept the Hastings project <br />for its support, that $520,000 component for it became available to apply toward another of the other <br />three uses cited in that Motion. <br />The Town went to bid for the six modulars to be installed by December 19, 2016, but there were no <br />bidders. The Town put out a second request for proposal with a relaxed delivery schedule of by <br />May 15, 2017. That produced two bids; however, both came in over the available funds. The selected bid <br />would raise the overall project cost by $1,430,000 —which would bring the total project cost to <br />$4,430,000. That increase over the budget is attributed to higher - than - estimated square -foot costs and <br />reconsidering locations from those planned when the modulars would have been acquired on a <br />3– year – rental basis, but now are to be purchased units with a 10 -year design life. (The new locations, <br />among other things, increased the square - footage of connectors to the main building and necessitated <br />storm –water collection.) However, as the $520,000 remains available from the November 2, 2015 <br />STM #1 appropriation, the Town plans to use that $520,000 for the modulars; thereby reducing the need <br />for a supplemental appropriation to the $910,000 being requested under this Article. This Committee <br />endorses that approach. <br />The Lexington School System (LPS) continues to face a severe space shortage in the elementary <br />(K –grade 5) levels due to a growing enrollment. The projected enrollments for grades K -5 from the LPS <br />are in Table 1. These projections are for enrollments as of October 1st of each school year and were <br />produced November 15, 2015, by the LPS. The enrollment as of August 31, 2016, is 3,046 -67 students <br />below the latest projection, but is within the expected variation from the projections. Enrollments <br />typically grow over the first month of the school year; that is why the official enrollment data used by the <br />State is the enrollment on October 14. Thus this year's enrollment is expected to be closer to projection by <br />October 14. <br />Table 1: Projected enrollments by school year for grades K -5. <br />The school - system capacity as the bu'ldings are currently used is given in Table 2. (See the table title for <br />the presumptions made in that data.) In this scenario, the additional space will just keep up with expected <br />enrollment growth as seen by comparing the enrollment projections to the Capacity in Table 2. Note, <br />5 <br />2016 -2017 <br />2017 -2018 <br />2018 -2019 <br />2019 -2020 <br />2020 -2021 <br />Median <br />3,113 <br />3,169 <br />3,246 <br />3,296 <br />3,344 <br />High <br />3,203 <br />3,285 <br />3,389 <br />3,467 <br />3,542 <br />The school - system capacity as the bu'ldings are currently used is given in Table 2. (See the table title for <br />the presumptions made in that data.) In this scenario, the additional space will just keep up with expected <br />enrollment growth as seen by comparing the enrollment projections to the Capacity in Table 2. Note, <br />5 <br />