Laserfiche WebLink
TOWN OF LEXINGTON <br />Permanent Building Committee <br />Permanent Members <br />Jon Himmel, Co-Chairman, Charles Favazzo, Co-Chairman, <br />Peter Johnson, Philip Coleman, Celis Brisbin, Elizabeth Giersbach, Frederick Merrill <br />Police Station Members: Semoon Oh, Wendy Krum <br />Associate Members: Curt Barrentine, Henrietta Mei <br /> <br />PBC Minutes for the meeting held on: 6-8-23 <br />Meeting was held remotely via Zoom <br /> <br />Members Present: <br />Jon Himmel, Elizabeth Giersbach, Semoon Oh, Wendy Krum, Henrietta Mei, Charles Favazzo <br /> <br />Others Present: <br />Mark Barrett, David Kanter, Steve Brown, Mark Sandeen, Mike Cronin, Mike McLean, , Henrietta Mei, Dan Voss, <br />Liza Bouton <br /> <br />The PBC Meeting was called to order at 5:00 pm. <br /> <br />Meeting Minutes <br /> <br />DPF status update on Westview Cemetery Building <br />Mark Barrett reported that the project was moving along. Interior wall board complete with prime & First coat are <br />complete. OH Doors are Complete. Plywood sheathing in the garage is 90%. <br />Final site work is ongoing. <br />Permanent Power scheduled for Tuesday 6/13/23 and equipment start up to follow <br />Ceiling grid and some ceiling tile cuts are in place. <br />Roofing edge metal remains. <br />Flooring and plumbing & Electrical finish over next two weeks. <br /> <br /> <br />DPF status update on Police Station Construction <br />Steve Brown provided an update on the Police Station construction. He reported that the slab on deck was poured, half <br />of the slab on grade was poured, and the remainder should be completed by next week. There was a lot of work done on <br />the sub surface infiltration chambers in three locations on site. In June, the road excavation and water lines will be <br />installed on Mass Avenue. The roof insulation and panels on the flat and pitched areas will be finished to prep for the final <br />roofing material. The installation of studs and exterior wall sheathing will be finished. There will be work on interior <br />concrete and stud walls. The interior underground electrical, plumbing, and SOG concrete will be completed. The <br />exterior waterproofing is also projected to be finished in June. Steve Brown shared photographs of the work. There will <br />likely be temporary window protection as interior work continues. The official milestone date for weather -tight was <br />sometime in October. It was reported that the construction was currently on schedule. Although, it was noted that the <br />switchgear delivery and the transformer confirmation by the utility are the long lead items with potential schedule impact, <br />so these will be monitored closely. <br /> <br />In answer to a question it was stated that the electric transformers will go back by the communications pole. <br /> <br />Mike Cronin reported that there was main water line damage last week. When the clamp was placed on the wet <br />tap, it fractured a pipe. A T-tap was put instead. DPW also had a challenge with the gate valves. Once those were <br />fixed, the water line was once again operational. It was reported that it will not be the last time that excavation will <br />occur in the street. <br /> <br /> <br />