Laserfiche WebLink
Waterstone Connector. Keith will ask Carolyn Kowalski to contact <br />MassDOT and MWRA to get the approval process in <br />motion. Stephen volunteered to be GCC’s contact person, for <br />what is expected to be a long term process. <br /> <br />Fairland Street Development. Now underway after protracted <br />period of getting approvals from abutters. No action needed by <br />GCC. <br /> <br />Benches on Trails. Bobak updated his proposal to put benches <br />along trails as rest stops. Envisioned is the type of bench that is at <br />the Visitors Center/Bikeway and along Mass. Ave. Individuals <br />would donate the cost of each bench and its installation in <br />exchange for naming rights. Locations typically would be distant <br />from road intersections to encourage long walks, especially with <br />young children. Primarily, but not necessarily, on Conservation <br />Land. Keith recommended scheduling a meeting with <br />Conservation staff as a next step. Alex noted that the Con Com <br />has a list of requirements and procedures that she will look <br />into. Susan noted the significant cost and administrative burden <br />of each bench installation. All to be dealt with as discussion <br />continues at subsequent GCC meetings. Suggested locations <br />should be submitted to Bobak. <br /> <br />GCC meeting times for the remainder of the year will be from 4:00 <br />to 5:30 pm. Next meeting on Monday October 16, 2023 <br /> <br />Bike/Ped Plan DraŌ <br />Greenways Corridor CommiƩee Endorsement ObservaƟons <br />Proposed AddiƟonal Work in Red <br />Final EdiƟon ‐ 9/18/23  <br />  <br />Proposed ACROSS Route 8/Concord Avenue ConservaƟon Parcel  <br />- New trail on parcel connecting to existing trails on DCR Beaver Brook North property <br />proposed along with crosswalk across Concord Avenue. Note: Final location of trail <br />crosswalk subject to pending Land Management Plan approval of new trail location.