|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2016-04-05-CONCOM-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Conservation Commission-ConCom
>
Minutes
>
2010-2019
>
2016
>
2016-04-05-CONCOM-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2019 1:14:49 PM
Creation date
6/3/2016 11:15:51 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - CONCOM - Conservation Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The commission questioned the use of herbicide on the site. Mr. McCarron stated that the <br />treatment would be used in small amounts and would be targeted to specific plants. <br />The commission requested that some native grass mix be used in addition to the flower seed mix. <br />Comments from the audience: <br />Mike, Friends of the Arlington Great Meadow, stated that they are in favor of the <br />ğĬğĭǩǤƓƭƉź <br />project and support it being expanded into the rest of the Great Meadow. <br />David Williams asked why they are focusing on just those three acres rather than the rest of the <br />meadow. Mr. McCarron explained that this area was the easiest to focus on because it is <br />surrounded by a trail system. He also stated that the site is going to change dramatically and we <br />did not want it to be too much change at one time. <br />th <br />Mr. McCarron added that there will be an informational walk on April 26 at 5pm for anyone <br />who is interested. <br />7:21pm <br />DET 16-14 <br />RDA, 11 Marshall <br />Owner/applicant: Huixing Yuan <br />Project: Removal and replacement of an existing driveway <br />Dan Schena, Landscaper <br />Mr. Schena explained that his client currently has a driveway that is overgrown and in very bad <br />shape. He stated that because of a previous Order of Conditions they must keep it permeable. <br />Questions and comments from the commission: <br />The commission stated that on their site visit, they realized the driveway was steep. They were <br />concerned that because of the steepness the water would run off rather than infiltrate. <br />The commission requested that Mr. Schena look into the engineering specs regarding infiltration <br />and slope. <br />The commission stated that it looked like there were some plantings in the 25 ft. buffer zone. <br />Motion to continue the hearing at the applicant’s request made by Mrs. Dohan and seconded by <br />Mr. Langseth. Vote: 6-0 in favor. <br />7:31pm <br />DEP File No. 201-1023, BL 980 <br />NOI, 3 Fiske Road <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.