Laserfiche WebLink
⎯Stormwater Analysis;Prepared by:Fred Russell,PE;Date:8/14/2023; <br />⎯Buffer Zone Restoration Plan;Prepared by:LEC Environmental;Date:8/14/2023; <br />⎯Revised Site Plan;Prepared by:Fred Russell,PE;Date revised:8/16/2023; <br />Mr.Rich Kirby,LEC Environmental,presented the revised plan and stormwater analysis to the <br />Commission.Mr.Kirby confirmed that all trees within the buffer zone are to remain. <br />Questions and Comments from the Commission: <br />−The existing conditions describe a total of 28,700 square feet of soils in HSG D,but the <br />proposed conditions show a total of 8,340 square feet of soils in HSG D.How can the <br />soil type change? <br />−Surprised that the weighted average curve number is reduced from existing to proposed <br />conditions.Expected that number to increase with the expansion of lawn into naturalized <br />areas. <br />On a motion by Ms.Ladd and seconded by Mr.Beuttell,the Commission voted 6-0 by roll call <br />vote to continue the hearing to the September 5,2023 meeting at the applicant’s request. <br />Record of Vote as Follows: <br />Duke Bitsko –Aye <br />Kevin Beuttell –Aye <br />Alex Dohan –Aye <br />Ruth Ladd –Aye <br />Jason Hnatko –Aye <br />Phil Hamilton –Aye <br />7:20 PM <br />Notice of Intent:75 Kendall Road <br />ViewPoint Cloud Permit#CNOI-23-18,DEP#201-1296 <br />Applicant/Property Owner:Saurav Khandelwal and Seema Badaya <br />Project:demolition of carport and construction of garage with second-story living space within <br />the 100-foot buffer zone to Bordering Vegetated Wetlands and 200-foot Riverfront Area <br />Supplemental Documentation Submitted: <br />⎯“Site Plan”and “Construction Details”;Prepared by:Henderson Consulting Services; <br />Date:6/20/2023 and revised (2)8/14/2023; <br />⎯Routing Diagram for 75 Kendall Drainage 2023 07-05;Date:8/7/2023;